提高拉加尔JSPL非回收印花焦炉装置生产效率

Rupak Ranjan, H. P. Tiwari, P. Srivastava, M. S. Raghuwanshi, A. K. Jaiswal, M. Borkar
{"title":"提高拉加尔JSPL非回收印花焦炉装置生产效率","authors":"Rupak Ranjan, H. P. Tiwari, P. Srivastava, M. S. Raghuwanshi, A. K. Jaiswal, M. Borkar","doi":"10.1051/metal/2020074","DOIUrl":null,"url":null,"abstract":"In recent past, Jindal Steel & Power Limited, Raigarh unit, has increased the hot metal production capacity by the renovation of the existing blast furnaces. Therefore, the blast furnace coke demand has increased. This excess demand for metallurgical coke production from the existing non-recovery stamp charge coke oven plant was a very tough challenge, because the coke oven plant was already running at rated production capacity. Therefore, to fulfill the requirement of excess coke and to deliver more value to the customers, several initiatives have been taken by the Coke Oven and Technical Services Department within the existing setup. Few approaches had been adopted to increase the productivity of coke by ∼20% without deteriorating the resultant coke quality. This paper describes in details the steps taken to enhance the productivity of non-recovery stamp charge coke oven plant.","PeriodicalId":21337,"journal":{"name":"Revue De Metallurgie-cahiers D Informations Techniques","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Enhancement of the productivity of non-recovery stamp charge coke oven plant at JSPL Raigarh\",\"authors\":\"Rupak Ranjan, H. P. Tiwari, P. Srivastava, M. S. Raghuwanshi, A. K. Jaiswal, M. Borkar\",\"doi\":\"10.1051/metal/2020074\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent past, Jindal Steel & Power Limited, Raigarh unit, has increased the hot metal production capacity by the renovation of the existing blast furnaces. Therefore, the blast furnace coke demand has increased. This excess demand for metallurgical coke production from the existing non-recovery stamp charge coke oven plant was a very tough challenge, because the coke oven plant was already running at rated production capacity. Therefore, to fulfill the requirement of excess coke and to deliver more value to the customers, several initiatives have been taken by the Coke Oven and Technical Services Department within the existing setup. Few approaches had been adopted to increase the productivity of coke by ∼20% without deteriorating the resultant coke quality. This paper describes in details the steps taken to enhance the productivity of non-recovery stamp charge coke oven plant.\",\"PeriodicalId\":21337,\"journal\":{\"name\":\"Revue De Metallurgie-cahiers D Informations Techniques\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revue De Metallurgie-cahiers D Informations Techniques\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1051/metal/2020074\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revue De Metallurgie-cahiers D Informations Techniques","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1051/metal/2020074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在最近的过去,金达尔钢铁和电力有限公司,Raigarh单位,通过改造现有的高炉,增加了铁水生产能力。因此,高炉焦炭的需求量有所增加。现有的非回收印花焦炉装置对冶金焦生产的过剩需求是一个非常严峻的挑战,因为焦炉装置已经在额定生产能力下运行。因此,为了满足多余焦炭的需求,并为客户提供更多的价值,焦炉和技术服务部在现有的设置下采取了一些措施。很少有方法可以在不降低焦炭质量的情况下将焦炭的生产效率提高~ 20%。本文详细介绍了提高非回收印花焦炉生产效率所采取的措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Enhancement of the productivity of non-recovery stamp charge coke oven plant at JSPL Raigarh
In recent past, Jindal Steel & Power Limited, Raigarh unit, has increased the hot metal production capacity by the renovation of the existing blast furnaces. Therefore, the blast furnace coke demand has increased. This excess demand for metallurgical coke production from the existing non-recovery stamp charge coke oven plant was a very tough challenge, because the coke oven plant was already running at rated production capacity. Therefore, to fulfill the requirement of excess coke and to deliver more value to the customers, several initiatives have been taken by the Coke Oven and Technical Services Department within the existing setup. Few approaches had been adopted to increase the productivity of coke by ∼20% without deteriorating the resultant coke quality. This paper describes in details the steps taken to enhance the productivity of non-recovery stamp charge coke oven plant.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信