基于PLC的微型水电厂SCADA

E. Yılmaz, M. Karayel
{"title":"基于PLC的微型水电厂SCADA","authors":"E. Yılmaz, M. Karayel","doi":"10.18178/IJOEE.4.1.67-70","DOIUrl":null,"url":null,"abstract":"The demand for electrical energy in the world is increasing every year. Hydroelectric Power Plants (HPP) in electricity generation are method is very commonly used. Hydroelectric power plants are huge facilities and occupy large areas. Hydroelectric power plants have a lot of special control and commination systems. Along with the increasing number of hydroelectric power plants applications, the need for the education of those systems has been unavoidable in engineering education. Training hydroelectric power plants, especially theoretically continue in the field of engineering. This is a problem. In this study, a prototype has been developed. Improved Micro Hydroelectric Power Plants (MHPP) by analyzing the performance of the prototype, the model are validated. ","PeriodicalId":13951,"journal":{"name":"International Journal of Electrical Energy","volume":"121 1","pages":"67-70"},"PeriodicalIF":0.0000,"publicationDate":"2016-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PLC Based SCADA for Micro Hydroelectric Power Plants\",\"authors\":\"E. Yılmaz, M. Karayel\",\"doi\":\"10.18178/IJOEE.4.1.67-70\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The demand for electrical energy in the world is increasing every year. Hydroelectric Power Plants (HPP) in electricity generation are method is very commonly used. Hydroelectric power plants are huge facilities and occupy large areas. Hydroelectric power plants have a lot of special control and commination systems. Along with the increasing number of hydroelectric power plants applications, the need for the education of those systems has been unavoidable in engineering education. Training hydroelectric power plants, especially theoretically continue in the field of engineering. This is a problem. In this study, a prototype has been developed. Improved Micro Hydroelectric Power Plants (MHPP) by analyzing the performance of the prototype, the model are validated. \",\"PeriodicalId\":13951,\"journal\":{\"name\":\"International Journal of Electrical Energy\",\"volume\":\"121 1\",\"pages\":\"67-70\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Electrical Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18178/IJOEE.4.1.67-70\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18178/IJOEE.4.1.67-70","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

世界上对电能的需求每年都在增加。水力发电厂(HPP)在发电方式中是非常常用的。水力发电厂设施庞大,占地面积大。水力发电厂有许多特殊的控制和通信系统。随着水电站应用数量的不断增加,工程教育中对水电系统教育的需求已不可避免。培训水力发电厂,特别是继续在工程领域的理论。这是一个问题。在这项研究中,已经开发了一个原型。通过对样机性能的分析,对所建模型进行了验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PLC Based SCADA for Micro Hydroelectric Power Plants
The demand for electrical energy in the world is increasing every year. Hydroelectric Power Plants (HPP) in electricity generation are method is very commonly used. Hydroelectric power plants are huge facilities and occupy large areas. Hydroelectric power plants have a lot of special control and commination systems. Along with the increasing number of hydroelectric power plants applications, the need for the education of those systems has been unavoidable in engineering education. Training hydroelectric power plants, especially theoretically continue in the field of engineering. This is a problem. In this study, a prototype has been developed. Improved Micro Hydroelectric Power Plants (MHPP) by analyzing the performance of the prototype, the model are validated. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信