132kV阿灵顿牵引站总谐波畸变的治理

C. Nel, O. Ajeigbe, S. Daniel Chowdhury
{"title":"132kV阿灵顿牵引站总谐波畸变的治理","authors":"C. Nel, O. Ajeigbe, S. Daniel Chowdhury","doi":"10.1109/POWERAFRICA.2017.7991285","DOIUrl":null,"url":null,"abstract":"The 132kV Arlington Traction Station is fed from the krooonstad Switch Station. The 132kV Arlington network is further broken down into 22kV feeders to supply rural substations like Steynsrus, Goedehoop and Klippan which are islanded networks without back feeds. These activities resulted in harmonic generations. A study conducted on the network quality of the 132kV network by the Eskom proved that the Total Harmonic Distortion (THD) of the Arlington traction network was above the 4% limit for HV and EHV networks as stipulated by NRS048 — 2007. This paper, therefore, proffers three strategies, the harmonic filtering, 12 or 18 pulses rectifiers and phase shifting transformer, to mitigate the harmonics generated within the network. Phase shifting transformer performs better in terms of technical effectiveness and financial simplicity. Also, the paper proposes the installation of 1×10MVA; 22kV substation to ensure a ring feed on the network and allows future development.","PeriodicalId":6601,"journal":{"name":"2017 IEEE PES PowerAfrica","volume":"12 1","pages":"550-554"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Taming the total harmonic distortion on the 132kV Arlington Traction Station\",\"authors\":\"C. Nel, O. Ajeigbe, S. Daniel Chowdhury\",\"doi\":\"10.1109/POWERAFRICA.2017.7991285\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The 132kV Arlington Traction Station is fed from the krooonstad Switch Station. The 132kV Arlington network is further broken down into 22kV feeders to supply rural substations like Steynsrus, Goedehoop and Klippan which are islanded networks without back feeds. These activities resulted in harmonic generations. A study conducted on the network quality of the 132kV network by the Eskom proved that the Total Harmonic Distortion (THD) of the Arlington traction network was above the 4% limit for HV and EHV networks as stipulated by NRS048 — 2007. This paper, therefore, proffers three strategies, the harmonic filtering, 12 or 18 pulses rectifiers and phase shifting transformer, to mitigate the harmonics generated within the network. Phase shifting transformer performs better in terms of technical effectiveness and financial simplicity. Also, the paper proposes the installation of 1×10MVA; 22kV substation to ensure a ring feed on the network and allows future development.\",\"PeriodicalId\":6601,\"journal\":{\"name\":\"2017 IEEE PES PowerAfrica\",\"volume\":\"12 1\",\"pages\":\"550-554\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE PES PowerAfrica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERAFRICA.2017.7991285\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE PES PowerAfrica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERAFRICA.2017.7991285","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

132kV阿灵顿牵引站由krooonstad开关站供电。132千伏的阿灵顿电网进一步分解为22千伏的馈线,以供应像Steynsrus, Goedehoop和Klippan这样的农村变电站,这些变电站是没有反馈的孤岛网络。这些活动产生了和谐的世代。Eskom对132kV电网质量的研究证明,阿灵顿牵引网的总谐波失真(THD)高于NRS048 - 2007规定的高压和超高压电网4%的限值。因此,本文提出了三种策略,谐波滤波,12或18脉冲整流器和移相变压器,以减轻网络内产生的谐波。移相变压器在技术有效性和财务简单性方面表现更好。并提出安装1×10MVA;22kV变电站保证了对电网的环形馈电,并允许未来发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Taming the total harmonic distortion on the 132kV Arlington Traction Station
The 132kV Arlington Traction Station is fed from the krooonstad Switch Station. The 132kV Arlington network is further broken down into 22kV feeders to supply rural substations like Steynsrus, Goedehoop and Klippan which are islanded networks without back feeds. These activities resulted in harmonic generations. A study conducted on the network quality of the 132kV network by the Eskom proved that the Total Harmonic Distortion (THD) of the Arlington traction network was above the 4% limit for HV and EHV networks as stipulated by NRS048 — 2007. This paper, therefore, proffers three strategies, the harmonic filtering, 12 or 18 pulses rectifiers and phase shifting transformer, to mitigate the harmonics generated within the network. Phase shifting transformer performs better in terms of technical effectiveness and financial simplicity. Also, the paper proposes the installation of 1×10MVA; 22kV substation to ensure a ring feed on the network and allows future development.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信