Rylan Paul Dsouza, R. Cornwall, Alan David Brodie, Pedro Patela, H. Daghmouni, Mohammad Hariz Arakkalakkam, Venkata Praveen Kumar Boni, Asif Khan Haq Dad Khan
{"title":"新型自主实时监测、控制和分析系统的案例研究,以最大限度地延长持续环空压力井的生产正常运行时间,同时提高HSE水平,并符合双屏障井完整性政策","authors":"Rylan Paul Dsouza, R. Cornwall, Alan David Brodie, Pedro Patela, H. Daghmouni, Mohammad Hariz Arakkalakkam, Venkata Praveen Kumar Boni, Asif Khan Haq Dad Khan","doi":"10.2118/208114-ms","DOIUrl":null,"url":null,"abstract":"\n This paper describes an innovative solution for the safe and effective management of wells with unplanned sustained annulus pressure (SAP). The solution restores double barrier integrity in the well and provides reliable real time annulus pressure and temperature data. It also has the functionality to autonomously bleed-off the annulus pressure at a pre-determined set point. As a result, the nature and severity of the SAP can be better understood, and in many cases wells that would otherwise have been closed in awaiting workover can remain in production.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case Study of a Novel Autonomous Real-Time Monitoring, Control and Analysis System, to Maximize Production Uptime on Sustained Annulus Pressure Wells, While Improving HSE and Compliance with Double Barrier Well Integrity Policies\",\"authors\":\"Rylan Paul Dsouza, R. Cornwall, Alan David Brodie, Pedro Patela, H. Daghmouni, Mohammad Hariz Arakkalakkam, Venkata Praveen Kumar Boni, Asif Khan Haq Dad Khan\",\"doi\":\"10.2118/208114-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper describes an innovative solution for the safe and effective management of wells with unplanned sustained annulus pressure (SAP). The solution restores double barrier integrity in the well and provides reliable real time annulus pressure and temperature data. It also has the functionality to autonomously bleed-off the annulus pressure at a pre-determined set point. As a result, the nature and severity of the SAP can be better understood, and in many cases wells that would otherwise have been closed in awaiting workover can remain in production.\",\"PeriodicalId\":10959,\"journal\":{\"name\":\"Day 3 Wed, November 17, 2021\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 17, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/208114-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208114-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Case Study of a Novel Autonomous Real-Time Monitoring, Control and Analysis System, to Maximize Production Uptime on Sustained Annulus Pressure Wells, While Improving HSE and Compliance with Double Barrier Well Integrity Policies
This paper describes an innovative solution for the safe and effective management of wells with unplanned sustained annulus pressure (SAP). The solution restores double barrier integrity in the well and provides reliable real time annulus pressure and temperature data. It also has the functionality to autonomously bleed-off the annulus pressure at a pre-determined set point. As a result, the nature and severity of the SAP can be better understood, and in many cases wells that would otherwise have been closed in awaiting workover can remain in production.