{"title":"风险分析:在全新飞机设计中的应用","authors":"Daniele Camatti, Sergio Chiesa, Paolo Maggiore","doi":"10.1016/S1369-8869(98)00002-0","DOIUrl":null,"url":null,"abstract":"<div><p>The aim of this paper is to introduce a risk analysis procedure to be applied when a completely new project is to be started. The object of the analysis is a new aircraft project carried out in the Aerospace Department of the Polytechnic of Turin. This project is quite unusual not because of the involved technology but for the very big dimensions (take-off weight=1350<!--> <!-->t). This procedure can indicate the industrial risk level whether the project will be developed further.</p></div>","PeriodicalId":100070,"journal":{"name":"Aircraft Design","volume":"1 1","pages":"Pages 1-11"},"PeriodicalIF":0.0000,"publicationDate":"1998-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1369-8869(98)00002-0","citationCount":"3","resultStr":"{\"title\":\"Risk analysis: sample application to a totally new aircraft design\",\"authors\":\"Daniele Camatti, Sergio Chiesa, Paolo Maggiore\",\"doi\":\"10.1016/S1369-8869(98)00002-0\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The aim of this paper is to introduce a risk analysis procedure to be applied when a completely new project is to be started. The object of the analysis is a new aircraft project carried out in the Aerospace Department of the Polytechnic of Turin. This project is quite unusual not because of the involved technology but for the very big dimensions (take-off weight=1350<!--> <!-->t). This procedure can indicate the industrial risk level whether the project will be developed further.</p></div>\",\"PeriodicalId\":100070,\"journal\":{\"name\":\"Aircraft Design\",\"volume\":\"1 1\",\"pages\":\"Pages 1-11\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1998-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S1369-8869(98)00002-0\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Aircraft Design\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1369886998000020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aircraft Design","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1369886998000020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk analysis: sample application to a totally new aircraft design
The aim of this paper is to introduce a risk analysis procedure to be applied when a completely new project is to be started. The object of the analysis is a new aircraft project carried out in the Aerospace Department of the Polytechnic of Turin. This project is quite unusual not because of the involved technology but for the very big dimensions (take-off weight=1350 t). This procedure can indicate the industrial risk level whether the project will be developed further.