{"title":"苏丹红海州GebeitAlsharaf大坝的发电潜力","authors":"M. Abdelgadir","doi":"10.19080/AIBM.2018.11.555809","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to study the possibility of using water power to drive a hydraulic turbine installed in the drinking water pipeline emerging from a dam. The dam is constructed in the Red Sea state by the Dams Implementation Unit Kaleidoscope to solve water supply problem by harvesting and storing rainwater. In this study the required data is collected from the site of the dam and analyzed in terms of hydrological and topographic studies. Using this data, the flow rate of water through the pipe is estimated by applying the energy equation using Excel program analysis. Given flow rate and available head, the power is calculated and found to be about 19.39 kW. Suitable turbine and generator are selected. Finally, the results are compared with those obtained when using the program (Hydro Help - CLOVA issue, January 2010) and found to give very close agreements.","PeriodicalId":7446,"journal":{"name":"Advances in Biotechnology & Microbiology","volume":"70 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Potentiality of Power Production from GebeitAlsharaf Dam, Red Sea State, Sudan\",\"authors\":\"M. Abdelgadir\",\"doi\":\"10.19080/AIBM.2018.11.555809\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this research is to study the possibility of using water power to drive a hydraulic turbine installed in the drinking water pipeline emerging from a dam. The dam is constructed in the Red Sea state by the Dams Implementation Unit Kaleidoscope to solve water supply problem by harvesting and storing rainwater. In this study the required data is collected from the site of the dam and analyzed in terms of hydrological and topographic studies. Using this data, the flow rate of water through the pipe is estimated by applying the energy equation using Excel program analysis. Given flow rate and available head, the power is calculated and found to be about 19.39 kW. Suitable turbine and generator are selected. Finally, the results are compared with those obtained when using the program (Hydro Help - CLOVA issue, January 2010) and found to give very close agreements.\",\"PeriodicalId\":7446,\"journal\":{\"name\":\"Advances in Biotechnology & Microbiology\",\"volume\":\"70 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Biotechnology & Microbiology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19080/AIBM.2018.11.555809\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Biotechnology & Microbiology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19080/AIBM.2018.11.555809","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是研究利用水力驱动安装在大坝饮用水管道中的水轮机的可能性。万花筒大坝是由大坝实施单位在红海州建造的,通过收集和储存雨水来解决供水问题。在这项研究中,所需的数据是从大坝现场收集的,并在水文和地形研究方面进行了分析。利用这些数据,利用Excel程序分析,应用能量方程估算了管道的流量。给定流量和可用扬程,计算得到功率约为19.39 kW。选择合适的水轮机和发电机。最后,将结果与使用程序(Hydro Help - CLOVA issue, 2010年1月)时获得的结果进行比较,发现两者非常接近。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Potentiality of Power Production from GebeitAlsharaf Dam, Red Sea State, Sudan
The purpose of this research is to study the possibility of using water power to drive a hydraulic turbine installed in the drinking water pipeline emerging from a dam. The dam is constructed in the Red Sea state by the Dams Implementation Unit Kaleidoscope to solve water supply problem by harvesting and storing rainwater. In this study the required data is collected from the site of the dam and analyzed in terms of hydrological and topographic studies. Using this data, the flow rate of water through the pipe is estimated by applying the energy equation using Excel program analysis. Given flow rate and available head, the power is calculated and found to be about 19.39 kW. Suitable turbine and generator are selected. Finally, the results are compared with those obtained when using the program (Hydro Help - CLOVA issue, January 2010) and found to give very close agreements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信