{"title":"基本建设项目的法律提示和技巧","authors":"Luke Robottom, Raquel Tarancon Plata","doi":"10.2118/197555-ms","DOIUrl":null,"url":null,"abstract":"This paper will consider some of the most common causes that result in major capital projects running into difficulties - including time pressure, inadequate planning, scope changes and communication failures – and will discuss potential ways to mitigate the risk, and help reduce the prospect, of future issues arising and how best to address them if they do (inevitably) arise. In particular, this paper will explore possible internal arrangements – including the involvement of the legal function at all stages of a project (from inception through procurement, execution and finalisation) - and contractual mechanisms which can be used to speed up decision making, reduce the length and complexity of negotiations, manage unexpected events and avoid commercial issues escalating into legal disputes.","PeriodicalId":11091,"journal":{"name":"Day 3 Wed, November 13, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Legal Tips and Tricks for Capital Projects\",\"authors\":\"Luke Robottom, Raquel Tarancon Plata\",\"doi\":\"10.2118/197555-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper will consider some of the most common causes that result in major capital projects running into difficulties - including time pressure, inadequate planning, scope changes and communication failures – and will discuss potential ways to mitigate the risk, and help reduce the prospect, of future issues arising and how best to address them if they do (inevitably) arise. In particular, this paper will explore possible internal arrangements – including the involvement of the legal function at all stages of a project (from inception through procurement, execution and finalisation) - and contractual mechanisms which can be used to speed up decision making, reduce the length and complexity of negotiations, manage unexpected events and avoid commercial issues escalating into legal disputes.\",\"PeriodicalId\":11091,\"journal\":{\"name\":\"Day 3 Wed, November 13, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 13, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/197555-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 13, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/197555-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文将考虑导致主要资本项目陷入困难的一些最常见的原因——包括时间压力、不充分的计划、范围变化和沟通失败——并将讨论减轻风险的潜在方法,并帮助减少未来出现问题的可能性,以及如果它们(不可避免地)出现,如何最好地解决它们。特别是,本文将探讨可能的内部安排-包括在项目的所有阶段(从开始到采购,执行和完成)法律职能的参与-以及可用于加快决策,减少谈判的长度和复杂性,管理意外事件和避免商业问题升级为法律纠纷的合同机制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Legal Tips and Tricks for Capital Projects
This paper will consider some of the most common causes that result in major capital projects running into difficulties - including time pressure, inadequate planning, scope changes and communication failures – and will discuss potential ways to mitigate the risk, and help reduce the prospect, of future issues arising and how best to address them if they do (inevitably) arise. In particular, this paper will explore possible internal arrangements – including the involvement of the legal function at all stages of a project (from inception through procurement, execution and finalisation) - and contractual mechanisms which can be used to speed up decision making, reduce the length and complexity of negotiations, manage unexpected events and avoid commercial issues escalating into legal disputes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信