一种带蓄热设施的热电联产风电机组调度方法

Huan Ma, Qun Chen, K. Hu, Yuanhang Dai, Lei Chen, Fei Xu, Y. Min
{"title":"一种带蓄热设施的热电联产风电机组调度方法","authors":"Huan Ma, Qun Chen, K. Hu, Yuanhang Dai, Lei Chen, Fei Xu, Y. Min","doi":"10.1109/ICRERA.2017.8191277","DOIUrl":null,"url":null,"abstract":"An effective way to solve the problem of wind power curtailment is to install heat storage (HS) facilities in CHP plants. However, the existing power grid does not have the ability to schedule the heat storage facilities. In this paper, we have developed the combined heat and power dispatching system to schedule the power plants as well as the heat storage facilities for the maximum effect of wind power accommodation. The results show that cooperating with the existing scheduling system, the combined heat and power dispatching system has fine-tuned the initial schedules with the adjustment of the heat storage facilities to achieve the desired effect of improving the wind power consumption. Meanwhile, the maximum heat storage amount of the HS facility that limits the capacity of increasing wind power accommodation. What's more, the capacity can be affected when the heat load varies seasonally owing to the external characteristics of the CHP unit.","PeriodicalId":6535,"journal":{"name":"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)","volume":"9 1","pages":"262-272"},"PeriodicalIF":0.0000,"publicationDate":"2017-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"A dispatch method of combined heat and power plants with heat storage facilities for wind power accommodation\",\"authors\":\"Huan Ma, Qun Chen, K. Hu, Yuanhang Dai, Lei Chen, Fei Xu, Y. Min\",\"doi\":\"10.1109/ICRERA.2017.8191277\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An effective way to solve the problem of wind power curtailment is to install heat storage (HS) facilities in CHP plants. However, the existing power grid does not have the ability to schedule the heat storage facilities. In this paper, we have developed the combined heat and power dispatching system to schedule the power plants as well as the heat storage facilities for the maximum effect of wind power accommodation. The results show that cooperating with the existing scheduling system, the combined heat and power dispatching system has fine-tuned the initial schedules with the adjustment of the heat storage facilities to achieve the desired effect of improving the wind power consumption. Meanwhile, the maximum heat storage amount of the HS facility that limits the capacity of increasing wind power accommodation. What's more, the capacity can be affected when the heat load varies seasonally owing to the external characteristics of the CHP unit.\",\"PeriodicalId\":6535,\"journal\":{\"name\":\"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)\",\"volume\":\"9 1\",\"pages\":\"262-272\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICRERA.2017.8191277\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 6th International Conference on Renewable Energy Research and Applications (ICRERA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRERA.2017.8191277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

解决风电弃风问题的有效途径是在热电联产电厂安装蓄热设备。然而,现有的电网没有能力安排储热设施。在本文中,我们开发了热电联产调度系统,以调度发电厂和蓄热设施,以最大限度地发挥风电调节的作用。结果表明,热电联产调度系统配合现有调度系统,通过蓄热设施的调整对初始调度进行微调,达到了提高风电消纳的预期效果。同时,HS设施的最大蓄热量限制了风电容纳容量的增加。此外,由于热电联产机组的外部特性,当热负荷发生季节性变化时,还会影响热电联产机组的容量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A dispatch method of combined heat and power plants with heat storage facilities for wind power accommodation
An effective way to solve the problem of wind power curtailment is to install heat storage (HS) facilities in CHP plants. However, the existing power grid does not have the ability to schedule the heat storage facilities. In this paper, we have developed the combined heat and power dispatching system to schedule the power plants as well as the heat storage facilities for the maximum effect of wind power accommodation. The results show that cooperating with the existing scheduling system, the combined heat and power dispatching system has fine-tuned the initial schedules with the adjustment of the heat storage facilities to achieve the desired effect of improving the wind power consumption. Meanwhile, the maximum heat storage amount of the HS facility that limits the capacity of increasing wind power accommodation. What's more, the capacity can be affected when the heat load varies seasonally owing to the external characteristics of the CHP unit.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信