用指标法估算旧地下巷道剩余金资源量——以实例为例

S. Al-Hassan, L. Aboagye
{"title":"用指标法估算旧地下巷道剩余金资源量——以实例为例","authors":"S. Al-Hassan, L. Aboagye","doi":"10.4314/GM.V10I1.42806","DOIUrl":null,"url":null,"abstract":"The lack of geological control and old underground development at AngloGold Ashanti (Bibiani mine) in Ghana was a major setback for the conventional methods of resource estimation to produce accurate estimates of the deposit. Consequently, inverse distance weighting of indicator variables were used. This estimation approach, however, overestimated the boundaries of the old underground workings (voids) into inappropriate areas of the resource model and thereby caused significant underestimation of ore tonnage and overestimation of grade. This paper highlights the study that re-evaluated the Bibiani deposit using indicator kriging. The results of re-evaluated reserves compared well with actual production figures in terms of tonnes, grade and stoping volume","PeriodicalId":12530,"journal":{"name":"Ghana Mining Journal","volume":"42 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2009-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation of Reminant Gold Resources of Old Underground Workings by Indicator Approach – A Case Study\",\"authors\":\"S. Al-Hassan, L. Aboagye\",\"doi\":\"10.4314/GM.V10I1.42806\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The lack of geological control and old underground development at AngloGold Ashanti (Bibiani mine) in Ghana was a major setback for the conventional methods of resource estimation to produce accurate estimates of the deposit. Consequently, inverse distance weighting of indicator variables were used. This estimation approach, however, overestimated the boundaries of the old underground workings (voids) into inappropriate areas of the resource model and thereby caused significant underestimation of ore tonnage and overestimation of grade. This paper highlights the study that re-evaluated the Bibiani deposit using indicator kriging. The results of re-evaluated reserves compared well with actual production figures in terms of tonnes, grade and stoping volume\",\"PeriodicalId\":12530,\"journal\":{\"name\":\"Ghana Mining Journal\",\"volume\":\"42 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-05-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ghana Mining Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4314/GM.V10I1.42806\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ghana Mining Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/GM.V10I1.42806","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

加纳AngloGold Ashanti (Bibiani矿)缺乏地质控制和古老的地下开发,这对常规资源估计方法产生准确的矿床估计是一个重大挫折。因此,采用指标变量距离逆加权。然而,这种估计方法将旧地下工作(空洞)的边界过高估计到资源模型的不适当区域,从而导致矿石吨位的严重低估和品位的高估。本文重点介绍了利用克里格指标对Bibiani矿床进行再评价的研究。就吨数、品位和回采量而言,重新评估储量的结果与实际生产数据比较良好
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Estimation of Reminant Gold Resources of Old Underground Workings by Indicator Approach – A Case Study
The lack of geological control and old underground development at AngloGold Ashanti (Bibiani mine) in Ghana was a major setback for the conventional methods of resource estimation to produce accurate estimates of the deposit. Consequently, inverse distance weighting of indicator variables were used. This estimation approach, however, overestimated the boundaries of the old underground workings (voids) into inappropriate areas of the resource model and thereby caused significant underestimation of ore tonnage and overestimation of grade. This paper highlights the study that re-evaluated the Bibiani deposit using indicator kriging. The results of re-evaluated reserves compared well with actual production figures in terms of tonnes, grade and stoping volume
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信