{"title":"运用层次分析法对工程项目进行后评价","authors":"Z. Sinuany-Stern, A. Amitai","doi":"10.1109/PICMET.1991.183632","DOIUrl":null,"url":null,"abstract":"The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts.<<ETX>>","PeriodicalId":22349,"journal":{"name":"Technology Management : the New International Language","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1991-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"The post-evaluation of an engineering project via AHP\",\"authors\":\"Z. Sinuany-Stern, A. Amitai\",\"doi\":\"10.1109/PICMET.1991.183632\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts.<<ETX>>\",\"PeriodicalId\":22349,\"journal\":{\"name\":\"Technology Management : the New International Language\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-10-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Technology Management : the New International Language\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICMET.1991.183632\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology Management : the New International Language","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.1991.183632","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

作者讨论了以色列贝尔谢瓦的一个大型工程项目的后评价,该项目采用新技术建造了一条新生产线,生产一种新型清洗剂。在这个事后评估中,一半的评估者将项目评为成功,而另一半则评为失败。但运用层次分析法(AHP)综合考虑多个属性后,各评价者的整体等级较高。使用的六个属性是:满足进度,满足预算,遵循原始设计的程度,性能质量,设计水平,以及部件的维护和可访问性水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The post-evaluation of an engineering project via AHP
The authors discuss the post-evaluation of a large engineering project in Beer-Sheva, Israel, in which a new production line was constructed using new technology to produce a new cleaning detergent. In this post-evaluation, half of the evaluators graded the project as a success, while the other half as a failure. But after using the analytical hierarchy (AHP), considering several attributes, the overall grade of grade of each evaluator was high. The six attributes used were: meeting the schedule, meeting the budget, how closely the original design was followed, performance quality, level of design, and the level of maintenance and accessibility of parts.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信