300MW级机组热网循环泵电转汽驱动两种经济性改造方案的比较研究

H. Cao, Yingying Yao, Shouheng Sun, Zeyang Li
{"title":"300MW级机组热网循环泵电转汽驱动两种经济性改造方案的比较研究","authors":"H. Cao, Yingying Yao, Shouheng Sun, Zeyang Li","doi":"10.12783/DTEEES/PEEES2020/35470","DOIUrl":null,"url":null,"abstract":"Jilin Province is located in the northern cold regions, winter heating period of up to five months, the thermal power plants in the larger proportion of the heating unit to improve the economy is a priority issue before us. Most thermal power plant in our province are used in electric network circulating pump run, a larger share of electricity plants, such as the use of steam-driven run, can reduce electricity consumption increased grid power plant, with better economic benefits, and whether the transformation potential, we need to demonstrate feasibility. To speed up the transformation project power industry the pace of industrial upgrading, power plant emissions-reduction targets.","PeriodicalId":11369,"journal":{"name":"DEStech Transactions on Environment, Energy and Earth Science","volume":"304 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"300MW Class Units Circulating Pump for Heating Network Electric to Steam-Driven Comparative Study of Two Kinds of Economic Transformation Program\",\"authors\":\"H. Cao, Yingying Yao, Shouheng Sun, Zeyang Li\",\"doi\":\"10.12783/DTEEES/PEEES2020/35470\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Jilin Province is located in the northern cold regions, winter heating period of up to five months, the thermal power plants in the larger proportion of the heating unit to improve the economy is a priority issue before us. Most thermal power plant in our province are used in electric network circulating pump run, a larger share of electricity plants, such as the use of steam-driven run, can reduce electricity consumption increased grid power plant, with better economic benefits, and whether the transformation potential, we need to demonstrate feasibility. To speed up the transformation project power industry the pace of industrial upgrading, power plant emissions-reduction targets.\",\"PeriodicalId\":11369,\"journal\":{\"name\":\"DEStech Transactions on Environment, Energy and Earth Science\",\"volume\":\"304 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"DEStech Transactions on Environment, Energy and Earth Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12783/DTEEES/PEEES2020/35470\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"DEStech Transactions on Environment, Energy and Earth Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12783/DTEEES/PEEES2020/35470","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

吉林省地处北方寒冷地区,冬季采暖期长达五个月,火电厂在供热机组中所占比重较大,提高机组经济性是摆在我们面前的首要问题。我省大部分火电厂都是采用电网循环泵运行,占比较大的电厂,如采用蒸汽驱动运行,可以减少电网电厂增加的用电量,具有较好的经济效益,而是否有改造潜力,还需论证可行性。要加快电力工业转型工程,加快产业升级步伐,实现电厂减排目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
300MW Class Units Circulating Pump for Heating Network Electric to Steam-Driven Comparative Study of Two Kinds of Economic Transformation Program
Jilin Province is located in the northern cold regions, winter heating period of up to five months, the thermal power plants in the larger proportion of the heating unit to improve the economy is a priority issue before us. Most thermal power plant in our province are used in electric network circulating pump run, a larger share of electricity plants, such as the use of steam-driven run, can reduce electricity consumption increased grid power plant, with better economic benefits, and whether the transformation potential, we need to demonstrate feasibility. To speed up the transformation project power industry the pace of industrial upgrading, power plant emissions-reduction targets.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信