{"title":"贝罗蒙特:在巴西最具争议的亚马逊大坝的斗争中的演员和争论","authors":"P. Fearnside","doi":"10.12854/ERDE-148-27","DOIUrl":null,"url":null,"abstract":"The reservoir of Brazil’s Belo Monte Dam was filled in December 2015. The dam’s planning, licensing and construction had rolled inexorably forward despite opposition from local victims of this development and from a wide array of other actors. Logical, legal and ethical arguments had less effect than the political and business forces prioritizing the dam. Part of the environmental destruction and human-rights violation at Belo Monte was apparently financed by taxpayers in North America and Europe with funds passed through Brazil’s National Bank for Economic and Social Development (BNDES) from development policy loans (DPLs) to Brazil by the World Bank. This opens the opportunity for World Bank reforms to eliminate loopholes allowing funding through financial intermediaries. The human and environmental cost of Belo Monte should also give pause to governments and financial institutions in promoting dams as their primary response to energy issues.","PeriodicalId":50505,"journal":{"name":"Erde","volume":"72 1","pages":"14-26"},"PeriodicalIF":1.2000,"publicationDate":"2017-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"32","resultStr":"{\"title\":\"Belo Monte: Actors and arguments in the struggle over Brazil’s most controversial Amazonian dam\",\"authors\":\"P. Fearnside\",\"doi\":\"10.12854/ERDE-148-27\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The reservoir of Brazil’s Belo Monte Dam was filled in December 2015. The dam’s planning, licensing and construction had rolled inexorably forward despite opposition from local victims of this development and from a wide array of other actors. Logical, legal and ethical arguments had less effect than the political and business forces prioritizing the dam. Part of the environmental destruction and human-rights violation at Belo Monte was apparently financed by taxpayers in North America and Europe with funds passed through Brazil’s National Bank for Economic and Social Development (BNDES) from development policy loans (DPLs) to Brazil by the World Bank. This opens the opportunity for World Bank reforms to eliminate loopholes allowing funding through financial intermediaries. The human and environmental cost of Belo Monte should also give pause to governments and financial institutions in promoting dams as their primary response to energy issues.\",\"PeriodicalId\":50505,\"journal\":{\"name\":\"Erde\",\"volume\":\"72 1\",\"pages\":\"14-26\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2017-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"32\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Erde\",\"FirstCategoryId\":\"89\",\"ListUrlMain\":\"https://doi.org/10.12854/ERDE-148-27\",\"RegionNum\":4,\"RegionCategory\":\"地球科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"GEOGRAPHY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Erde","FirstCategoryId":"89","ListUrlMain":"https://doi.org/10.12854/ERDE-148-27","RegionNum":4,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOGRAPHY","Score":null,"Total":0}
Belo Monte: Actors and arguments in the struggle over Brazil’s most controversial Amazonian dam
The reservoir of Brazil’s Belo Monte Dam was filled in December 2015. The dam’s planning, licensing and construction had rolled inexorably forward despite opposition from local victims of this development and from a wide array of other actors. Logical, legal and ethical arguments had less effect than the political and business forces prioritizing the dam. Part of the environmental destruction and human-rights violation at Belo Monte was apparently financed by taxpayers in North America and Europe with funds passed through Brazil’s National Bank for Economic and Social Development (BNDES) from development policy loans (DPLs) to Brazil by the World Bank. This opens the opportunity for World Bank reforms to eliminate loopholes allowing funding through financial intermediaries. The human and environmental cost of Belo Monte should also give pause to governments and financial institutions in promoting dams as their primary response to energy issues.
期刊介绍:
DIE ERDE is a publication of the Geographical Society of Berlin
DIE ERDE is a scientific journal in Geography, with four issues per year with about 100 pages each. It covers all aspects of geographical research, focusing on both earth system studies and regional contributions.
DIE ERDE invites contributions from any subfield of both Physical and Human Geography as well as from neighbouring disciplines.