新沃罗涅日-2号机组1、2号机组和列宁格勒-2号机组超燃燃烧系统效率测量数值模拟结果与反应堆物理启动试验测量结果的比较

V. Kulikov, N. Zhylmaganbetov, A. Popykin, A. Smirnova, L. Kryakvin, V. Pitilimov, O. Sedov, V. Tereshonok, R. Sizov
{"title":"新沃罗涅日-2号机组1、2号机组和列宁格勒-2号机组超燃燃烧系统效率测量数值模拟结果与反应堆物理启动试验测量结果的比较","authors":"V. Kulikov, N. Zhylmaganbetov, A. Popykin, A. Smirnova, L. Kryakvin, V. Pitilimov, O. Sedov, V. Tereshonok, R. Sizov","doi":"10.55176/2414-1038-2020-3-80-87","DOIUrl":null,"url":null,"abstract":"The article represents the results of measurement and numerical simulation of measurement of scram-system efficiency of reactor plants performed during the reactor physical startup tests of Novovoronezh-2 units 1, 2 and Leningrad-2 unit 1. These power units are equipped with a reactor VVER-1200, therefore, one numerical simulation of measurement of scram-system efficiency on the basis of the reactor project was performed. The article represents comparisons of the calculated and the measured currents of the ionization chambers and the readings of reactimeter calculate for them during measurement of scram-system efficiency.","PeriodicalId":20426,"journal":{"name":"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"COMPARISON OF THE RESULTS OF NUMERICAL SIMULATION OF MEASUREMENT OF SCRAM-SYSTEM EFFICIENCY AND MEASUREMENT PERFORMED DURING THE REACTOR PHYSICAL STARTUP TESTS OF UNITS 1, 2 NOVOVORONEZH-2 NPP AND UNIT 1 LENINGRAD-2 NPP\",\"authors\":\"V. Kulikov, N. Zhylmaganbetov, A. Popykin, A. Smirnova, L. Kryakvin, V. Pitilimov, O. Sedov, V. Tereshonok, R. Sizov\",\"doi\":\"10.55176/2414-1038-2020-3-80-87\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article represents the results of measurement and numerical simulation of measurement of scram-system efficiency of reactor plants performed during the reactor physical startup tests of Novovoronezh-2 units 1, 2 and Leningrad-2 unit 1. These power units are equipped with a reactor VVER-1200, therefore, one numerical simulation of measurement of scram-system efficiency on the basis of the reactor project was performed. The article represents comparisons of the calculated and the measured currents of the ionization chambers and the readings of reactimeter calculate for them during measurement of scram-system efficiency.\",\"PeriodicalId\":20426,\"journal\":{\"name\":\"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55176/2414-1038-2020-3-80-87\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55176/2414-1038-2020-3-80-87","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了在新沃罗涅日-2号机组1、2号机组和列宁格勒-2号机组1号机组物理启动试验中,对反应堆装置超燃燃烧系统效率进行测量和数值模拟的结果。这些发电机组配备了一台VVER-1200型反应堆,因此,根据该反应堆工程进行了超燃燃烧系统效率测量的数值模拟。本文介绍了超燃燃烧系统效率测量中电离室电流的计算值与实测值以及电抗仪计算值的比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
COMPARISON OF THE RESULTS OF NUMERICAL SIMULATION OF MEASUREMENT OF SCRAM-SYSTEM EFFICIENCY AND MEASUREMENT PERFORMED DURING THE REACTOR PHYSICAL STARTUP TESTS OF UNITS 1, 2 NOVOVORONEZH-2 NPP AND UNIT 1 LENINGRAD-2 NPP
The article represents the results of measurement and numerical simulation of measurement of scram-system efficiency of reactor plants performed during the reactor physical startup tests of Novovoronezh-2 units 1, 2 and Leningrad-2 unit 1. These power units are equipped with a reactor VVER-1200, therefore, one numerical simulation of measurement of scram-system efficiency on the basis of the reactor project was performed. The article represents comparisons of the calculated and the measured currents of the ionization chambers and the readings of reactimeter calculate for them during measurement of scram-system efficiency.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信