选择加纳风能开发的合适地点

P. Baffoe, D. Sarpong
{"title":"选择加纳风能开发的合适地点","authors":"P. Baffoe, D. Sarpong","doi":"10.4314/GM.V16I1.2","DOIUrl":null,"url":null,"abstract":"Recent energy crisis in Ghana has led to an intense search for an alternate energy solution. Currently the country is relying on fossil fuel for electricity generation. About 43% of energy generated in the country is from fossil fuel thermal energy. In the event of shortages in petroleum products, these power plants will have to shut down or run on a low capacity resulting in load shedding routines. In order to explore an alternate energy source, the National Renewable Energy Laboratory (NREL) conducted a study to assess Ghana’s wind energy potential. Some areas across the country were found to have enough wind resource for power generation. However, sites for wind farms are not wind speed dependent only; other underlying factors also play an important role in the site selection process. The objectives of this research work are to identify these factors and integrate them in the site selection process within a GIS environment. The site selection was based on two major kinds of criteria setting; the constraints and factor criteria. Layers of these criteria setting were combined using the overlay function in a GIS environment. Weights were also assigned to the factor criteria layers using pairwise comparisons. Suitable sites were selected in five regions after incorporating the various criteria. A total of 142 isolated sites were selected after incorporating a number of factors and constraints. The optimal arrangement of the turbines for the Oforikrom site was also designed. This research recommends that the existing land use and ownership of the selected sites should be ascertained. Wind speed measuring masts should also be erected at the various sites to determine the economic viability of setting up a commercial wind farm. Keywords : Wind Energy, Wind Farm, GIS, Criteria","PeriodicalId":12530,"journal":{"name":"Ghana Mining Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2016-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":"{\"title\":\"Selecting Suitable Sites for Wind Energy Development in Ghana\",\"authors\":\"P. Baffoe, D. Sarpong\",\"doi\":\"10.4314/GM.V16I1.2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recent energy crisis in Ghana has led to an intense search for an alternate energy solution. Currently the country is relying on fossil fuel for electricity generation. About 43% of energy generated in the country is from fossil fuel thermal energy. In the event of shortages in petroleum products, these power plants will have to shut down or run on a low capacity resulting in load shedding routines. In order to explore an alternate energy source, the National Renewable Energy Laboratory (NREL) conducted a study to assess Ghana’s wind energy potential. Some areas across the country were found to have enough wind resource for power generation. However, sites for wind farms are not wind speed dependent only; other underlying factors also play an important role in the site selection process. The objectives of this research work are to identify these factors and integrate them in the site selection process within a GIS environment. The site selection was based on two major kinds of criteria setting; the constraints and factor criteria. Layers of these criteria setting were combined using the overlay function in a GIS environment. Weights were also assigned to the factor criteria layers using pairwise comparisons. Suitable sites were selected in five regions after incorporating the various criteria. A total of 142 isolated sites were selected after incorporating a number of factors and constraints. The optimal arrangement of the turbines for the Oforikrom site was also designed. This research recommends that the existing land use and ownership of the selected sites should be ascertained. Wind speed measuring masts should also be erected at the various sites to determine the economic viability of setting up a commercial wind farm. Keywords : Wind Energy, Wind Farm, GIS, Criteria\",\"PeriodicalId\":12530,\"journal\":{\"name\":\"Ghana Mining Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"20\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ghana Mining Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4314/GM.V16I1.2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ghana Mining Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/GM.V16I1.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20

摘要

加纳最近的能源危机促使人们积极寻找替代能源解决方案。目前这个国家依靠化石燃料发电。该国约43%的能源来自化石燃料热能。在石油产品短缺的情况下,这些发电厂将不得不关闭或以低容量运行,从而导致负荷减少。为了探索一种替代能源,国家可再生能源实验室(NREL)进行了一项研究,以评估加纳的风能潜力。全国一些地区被发现有足够的风力资源用于发电。然而,风力发电场的选址不仅取决于风速;其他潜在因素在选址过程中也起着重要作用。这项研究工作的目标是确定这些因素,并将它们纳入地理信息系统环境下的选址过程。选址基于两种主要的标准设定;约束条件和因素标准。这些标准设置的层在GIS环境中使用叠加功能进行组合。还使用两两比较将权重分配给因子标准层。在综合各项标准后,在五个地区选出合适的地点。在综合了许多因素和限制条件后,总共选择了142个孤立的地点。还设计了Oforikrom场址涡轮机的最佳布置。这项研究建议,应确定选定地点的现有土地用途和所有权。风速测量桅杆也应该竖立在不同的地点,以确定建立一个商业风力发电场的经济可行性。关键词:风能,风电场,GIS,标准
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Selecting Suitable Sites for Wind Energy Development in Ghana
Recent energy crisis in Ghana has led to an intense search for an alternate energy solution. Currently the country is relying on fossil fuel for electricity generation. About 43% of energy generated in the country is from fossil fuel thermal energy. In the event of shortages in petroleum products, these power plants will have to shut down or run on a low capacity resulting in load shedding routines. In order to explore an alternate energy source, the National Renewable Energy Laboratory (NREL) conducted a study to assess Ghana’s wind energy potential. Some areas across the country were found to have enough wind resource for power generation. However, sites for wind farms are not wind speed dependent only; other underlying factors also play an important role in the site selection process. The objectives of this research work are to identify these factors and integrate them in the site selection process within a GIS environment. The site selection was based on two major kinds of criteria setting; the constraints and factor criteria. Layers of these criteria setting were combined using the overlay function in a GIS environment. Weights were also assigned to the factor criteria layers using pairwise comparisons. Suitable sites were selected in five regions after incorporating the various criteria. A total of 142 isolated sites were selected after incorporating a number of factors and constraints. The optimal arrangement of the turbines for the Oforikrom site was also designed. This research recommends that the existing land use and ownership of the selected sites should be ascertained. Wind speed measuring masts should also be erected at the various sites to determine the economic viability of setting up a commercial wind farm. Keywords : Wind Energy, Wind Farm, GIS, Criteria
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信