{"title":"运用多时间序列分析,对汽车发动机装配线生产进行了案例分析","authors":"Toni M. Somers, Yash P. Gupta","doi":"10.1016/0167-188X(91)90005-M","DOIUrl":null,"url":null,"abstract":"<div><p>In recent years researchers have dealt with multiple time series problems in practically meaningful ways. In this paper, the assembly-line data of a major producer of automobile engines is analyzed and multivariate models are constructed and estimated to investigate the relationship among weekly engine production, downtime and the man-hours worked. The assembly line is operated on a Just-In-Time basis for normally two shifts per five day week. Such an analysis could help them in developing contingency plans consistent with their obligations to the automobile manufacturer they supplied.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"21 3","pages":"Pages 243-258"},"PeriodicalIF":0.0000,"publicationDate":"1991-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(91)90005-M","citationCount":"3","resultStr":"{\"title\":\"Using multiple time-series analysis, of assembly-line production of automobile engines — a case study\",\"authors\":\"Toni M. Somers, Yash P. Gupta\",\"doi\":\"10.1016/0167-188X(91)90005-M\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>In recent years researchers have dealt with multiple time series problems in practically meaningful ways. In this paper, the assembly-line data of a major producer of automobile engines is analyzed and multivariate models are constructed and estimated to investigate the relationship among weekly engine production, downtime and the man-hours worked. The assembly line is operated on a Just-In-Time basis for normally two shifts per five day week. Such an analysis could help them in developing contingency plans consistent with their obligations to the automobile manufacturer they supplied.</p></div>\",\"PeriodicalId\":100476,\"journal\":{\"name\":\"Engineering Costs and Production Economics\",\"volume\":\"21 3\",\"pages\":\"Pages 243-258\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0167-188X(91)90005-M\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Costs and Production Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0167188X9190005M\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9190005M","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Using multiple time-series analysis, of assembly-line production of automobile engines — a case study
In recent years researchers have dealt with multiple time series problems in practically meaningful ways. In this paper, the assembly-line data of a major producer of automobile engines is analyzed and multivariate models are constructed and estimated to investigate the relationship among weekly engine production, downtime and the man-hours worked. The assembly line is operated on a Just-In-Time basis for normally two shifts per five day week. Such an analysis could help them in developing contingency plans consistent with their obligations to the automobile manufacturer they supplied.