{"title":"ANALISIS BEBAN KERJA MENGGUNAKAN HIRARC PADA DAPUR TDHT PHASE-1 PT. ARYA WIRA DINAMIKA","authors":"Arief Arya Fahrezi, Achmad Zaki Yamani, Muhammad Qurthuby","doi":"10.37859/jst.v9i1.3663","DOIUrl":null,"url":null,"abstract":"At PT. Arya Wira Dinamika is a contracting company engaged in mining & construction contracts. This research is for the Retubing Furnance work 018F-102 Green Refinery Revamp TDHT PHASE-1 in the FOC-2 Pertamina RU IV Area because the work place is at a height and has limited activity space in the oil processing kitchen, the risk of hazard is fairly high. This study was conducted to analyze occupational risks using the HIRARC (Hazard Identification, Risk Assessment, & Risk Control) method. Based on the analyzed data, it was found that there are 10 risks of work accidents in the work process of Retubing Furnance 018F-102 Green Refinery Revamp, there is 1 type of activity that is categorized as small risk, 5 types of activity with moderate risk category, and 4 types of risk with high category. From the results of the HIRARC analysis and assessment, workers are required to use PPE (Personal Protective Equipment) in accordance with the regulations from the company and from Pertamina RU IV and the type of work carried out and must comply with the SOPs applicable to the company.","PeriodicalId":17743,"journal":{"name":"Jurnal Surya Teknika","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Surya Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37859/jst.v9i1.3663","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

At PT. Arya Wira Dinamika是一家从事采矿和建筑合同的承包公司。本研究是针对位于FOC-2 Pertamina RU IV区的re油管炉工作018F-102绿色炼油厂改造TDHT阶段1,因为工作地点在石油加工厨房的高度和有限的活动空间,危害风险相当高。本研究采用HIRARC (Hazard Identification, Risk Assessment, and Risk Control)方法分析职业风险。通过对数据的分析,发现再管炉018F-102绿色炼油厂改造作业过程中存在10个作业事故风险,其中1个为小风险类作业,5个为中等风险类作业,4个为高风险类作业。从HIRARC分析和评估的结果来看,工人必须根据公司和Pertamina RU IV的规定和所进行的工作类型使用PPE(个人防护装备),并且必须遵守适用于公司的标准操作规程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS BEBAN KERJA MENGGUNAKAN HIRARC PADA DAPUR TDHT PHASE-1 PT. ARYA WIRA DINAMIKA
At PT. Arya Wira Dinamika is a contracting company engaged in mining & construction contracts. This research is for the Retubing Furnance work 018F-102 Green Refinery Revamp TDHT PHASE-1 in the FOC-2 Pertamina RU IV Area because the work place is at a height and has limited activity space in the oil processing kitchen, the risk of hazard is fairly high. This study was conducted to analyze occupational risks using the HIRARC (Hazard Identification, Risk Assessment, & Risk Control) method. Based on the analyzed data, it was found that there are 10 risks of work accidents in the work process of Retubing Furnance 018F-102 Green Refinery Revamp, there is 1 type of activity that is categorized as small risk, 5 types of activity with moderate risk category, and 4 types of risk with high category. From the results of the HIRARC analysis and assessment, workers are required to use PPE (Personal Protective Equipment) in accordance with the regulations from the company and from Pertamina RU IV and the type of work carried out and must comply with the SOPs applicable to the company.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信