{"title":"考虑工人技能的任务时间不确定u型装配线平衡问题鲁棒公式","authors":"Ö. Yılmaz","doi":"10.36287/setsci.4.6.015","DOIUrl":null,"url":null,"abstract":"The U-shaped assembly line balancing (UALB) problem has been extensively investigated in the existing academic literature. However, only a limited number of studies consider the uncertainty in the assembly lines. In this research, a robust formulation is developed for the addressed problem under task time uncertainty by focusing on the heterogeneity inherent of workers. The worker resources are not the same in terms of either skills or skill levels. Therefore, it is plausible to investigate the manufacturing system from this perspective to provide managerial insights regarding the performance metrics, such as the total cost, number of stations. Besides, the uncertainty of processes in a manufacturing system must be considered to improve system performance. Since robust optimization is a powerful technique to overcome uncertainty, the robust approach is employed in this study. First, the UALB problem is presented and followed by that the robust counterpart of this model is provided. The optimal results are obtained for different parameter levels after solving the model. The analysis of the results is made through real data provided by a water-meter assembly line.","PeriodicalId":6817,"journal":{"name":"4th International Symposium on Innovative Approaches in Engineering and Natural Sciences Proceedings","volume":"16 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Robust Formulation for U-shaped Assembly Line Balancing Problem Under Task Time Uncertainty by Considering Worker Skills\",\"authors\":\"Ö. Yılmaz\",\"doi\":\"10.36287/setsci.4.6.015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The U-shaped assembly line balancing (UALB) problem has been extensively investigated in the existing academic literature. However, only a limited number of studies consider the uncertainty in the assembly lines. In this research, a robust formulation is developed for the addressed problem under task time uncertainty by focusing on the heterogeneity inherent of workers. The worker resources are not the same in terms of either skills or skill levels. Therefore, it is plausible to investigate the manufacturing system from this perspective to provide managerial insights regarding the performance metrics, such as the total cost, number of stations. Besides, the uncertainty of processes in a manufacturing system must be considered to improve system performance. Since robust optimization is a powerful technique to overcome uncertainty, the robust approach is employed in this study. First, the UALB problem is presented and followed by that the robust counterpart of this model is provided. The optimal results are obtained for different parameter levels after solving the model. The analysis of the results is made through real data provided by a water-meter assembly line.\",\"PeriodicalId\":6817,\"journal\":{\"name\":\"4th International Symposium on Innovative Approaches in Engineering and Natural Sciences Proceedings\",\"volume\":\"16 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"4th International Symposium on Innovative Approaches in Engineering and Natural Sciences Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36287/setsci.4.6.015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"4th International Symposium on Innovative Approaches in Engineering and Natural Sciences Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36287/setsci.4.6.015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在现有的学术文献中,对u型装配线平衡问题进行了广泛的研究。然而,只有有限数量的研究考虑了装配线的不确定性。在本研究中,通过关注工人的内在异质性,为任务时间不确定性下解决的问题开发了一个稳健的公式。工人资源在技能或技能水平方面都不相同。因此,从这个角度对制造系统进行调查,以提供有关绩效指标(如总成本、工位数量)的管理见解是合理的。此外,为了提高系统性能,必须考虑制造系统过程的不确定性。由于鲁棒优化是一种克服不确定性的强大技术,因此本研究采用了鲁棒方法。首先提出了UALB问题,然后给出了该模型的鲁棒对应模型。对模型进行求解,得到了不同参数水平下的最优结果。通过水表装配线提供的实际数据对结果进行了分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Robust Formulation for U-shaped Assembly Line Balancing Problem Under Task Time Uncertainty by Considering Worker Skills
The U-shaped assembly line balancing (UALB) problem has been extensively investigated in the existing academic literature. However, only a limited number of studies consider the uncertainty in the assembly lines. In this research, a robust formulation is developed for the addressed problem under task time uncertainty by focusing on the heterogeneity inherent of workers. The worker resources are not the same in terms of either skills or skill levels. Therefore, it is plausible to investigate the manufacturing system from this perspective to provide managerial insights regarding the performance metrics, such as the total cost, number of stations. Besides, the uncertainty of processes in a manufacturing system must be considered to improve system performance. Since robust optimization is a powerful technique to overcome uncertainty, the robust approach is employed in this study. First, the UALB problem is presented and followed by that the robust counterpart of this model is provided. The optimal results are obtained for different parameter levels after solving the model. The analysis of the results is made through real data provided by a water-meter assembly line.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信