Hai-bo Liu, Jinsheng Du, Xueliang Chang, Yingpeng Tan
{"title":"多跨连续刚构桥合闸方案","authors":"Hai-bo Liu, Jinsheng Du, Xueliang Chang, Yingpeng Tan","doi":"10.1109/MACE.2010.5535833","DOIUrl":null,"url":null,"abstract":"The closure of Multi-span continuous rigid frame bridge is one of important steps in its construction. The selection of closure scheme determines the deformation and stress state of the bridge when construction is completed. In this paper, based on the situation of Jing River Bridge, which is now under construction in Gansu Province, finite element method is applied to analyze and compare the inner forces, stress and deformation of the bridge with five possible closure schemes. As a result, the most reasonable and engineering feasible closure scheme is obtained.","PeriodicalId":6349,"journal":{"name":"2010 International Conference on Mechanic Automation and Control Engineering","volume":"51 1","pages":"780-783"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Closure schemes of Multi-span continuous rigid frame bridges\",\"authors\":\"Hai-bo Liu, Jinsheng Du, Xueliang Chang, Yingpeng Tan\",\"doi\":\"10.1109/MACE.2010.5535833\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The closure of Multi-span continuous rigid frame bridge is one of important steps in its construction. The selection of closure scheme determines the deformation and stress state of the bridge when construction is completed. In this paper, based on the situation of Jing River Bridge, which is now under construction in Gansu Province, finite element method is applied to analyze and compare the inner forces, stress and deformation of the bridge with five possible closure schemes. As a result, the most reasonable and engineering feasible closure scheme is obtained.\",\"PeriodicalId\":6349,\"journal\":{\"name\":\"2010 International Conference on Mechanic Automation and Control Engineering\",\"volume\":\"51 1\",\"pages\":\"780-783\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Mechanic Automation and Control Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MACE.2010.5535833\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Mechanic Automation and Control Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MACE.2010.5535833","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Closure schemes of Multi-span continuous rigid frame bridges
The closure of Multi-span continuous rigid frame bridge is one of important steps in its construction. The selection of closure scheme determines the deformation and stress state of the bridge when construction is completed. In this paper, based on the situation of Jing River Bridge, which is now under construction in Gansu Province, finite element method is applied to analyze and compare the inner forces, stress and deformation of the bridge with five possible closure schemes. As a result, the most reasonable and engineering feasible closure scheme is obtained.