{"title":"敞开式 TBM 施工隧道超前地质预报技术研究与应用","authors":"王 文飞","doi":"10.26789/szgc.v7i4.905","DOIUrl":null,"url":null,"abstract":"为了解决大理—瑞丽铁路高黎贡山隧道TBM机械对花岗岩地层糜棱化、富水等不良地质条件适应性差,导致TBM硬岩掘进机出现多次卡机停工的问题。通过对超前地质预报工作实践、研究分析,建立了以下超前地质预报工作机制:①采用TSP进行长距离物理探测;②建立物性指标将预报结果、掘进参数进行风险等级划分;③根据风险等级以及现场地质情况进行超前钻孔验证;此机制弥补了TBM物理探测手段应用少的缺陷,有效地降低了TBM卡机风险,一定程度上减少了对施工的影响,可为TBM施工隧道方案的制订及围岩设计的变更提供依据。","PeriodicalId":58331,"journal":{"name":"城乡建设","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"敞开式 TBM 施工隧道超前地质预报技术研究与应用\",\"authors\":\"王 文飞\",\"doi\":\"10.26789/szgc.v7i4.905\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"为了解决大理—瑞丽铁路高黎贡山隧道TBM机械对花岗岩地层糜棱化、富水等不良地质条件适应性差,导致TBM硬岩掘进机出现多次卡机停工的问题。通过对超前地质预报工作实践、研究分析,建立了以下超前地质预报工作机制:①采用TSP进行长距离物理探测;②建立物性指标将预报结果、掘进参数进行风险等级划分;③根据风险等级以及现场地质情况进行超前钻孔验证;此机制弥补了TBM物理探测手段应用少的缺陷,有效地降低了TBM卡机风险,一定程度上减少了对施工的影响,可为TBM施工隧道方案的制订及围岩设计的变更提供依据。\",\"PeriodicalId\":58331,\"journal\":{\"name\":\"城乡建设\",\"volume\":\"31 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"城乡建设\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.26789/szgc.v7i4.905\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"城乡建设","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.26789/szgc.v7i4.905","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0