{"title":"具有风险管理的相关供应链仪表板","authors":"Jellouli Olfa","doi":"10.59160/ijscm.v12.i01.6158","DOIUrl":null,"url":null,"abstract":"To have strategy actions, we need a dashboard and making the latter one is an easy action if we fixe relevant objectives. However, sometimes the dashboard is not composed of relevant performance indicators and we must study the risks linked to these latter. In fact, this is the objective of this article.","PeriodicalId":37872,"journal":{"name":"International Journal of Construction Supply Chain Management","volume":"59 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Relevant Supply Chain Dashboard with Risk Management\",\"authors\":\"Jellouli Olfa\",\"doi\":\"10.59160/ijscm.v12.i01.6158\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To have strategy actions, we need a dashboard and making the latter one is an easy action if we fixe relevant objectives. However, sometimes the dashboard is not composed of relevant performance indicators and we must study the risks linked to these latter. In fact, this is the objective of this article.\",\"PeriodicalId\":37872,\"journal\":{\"name\":\"International Journal of Construction Supply Chain Management\",\"volume\":\"59 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Construction Supply Chain Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.59160/ijscm.v12.i01.6158\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Construction Supply Chain Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59160/ijscm.v12.i01.6158","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
A Relevant Supply Chain Dashboard with Risk Management
To have strategy actions, we need a dashboard and making the latter one is an easy action if we fixe relevant objectives. However, sometimes the dashboard is not composed of relevant performance indicators and we must study the risks linked to these latter. In fact, this is the objective of this article.