{"title":"超高速率复合材料沉积系统有望比铺设目标高出75%","authors":"","doi":"10.12968/s0034-3617(23)70015-5","DOIUrl":null,"url":null,"abstract":"Mark Bowering, NCC's chief engineer for civil air structures describes how a new deposition system could reduce production costs and improve operation flexibility.","PeriodicalId":101069,"journal":{"name":"Reinforced Plastics","volume":"46 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ultra high-rate composite deposition system on track to beat lay-up target by 75%\",\"authors\":\"\",\"doi\":\"10.12968/s0034-3617(23)70015-5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Mark Bowering, NCC's chief engineer for civil air structures describes how a new deposition system could reduce production costs and improve operation flexibility.\",\"PeriodicalId\":101069,\"journal\":{\"name\":\"Reinforced Plastics\",\"volume\":\"46 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Reinforced Plastics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12968/s0034-3617(23)70015-5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Reinforced Plastics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12968/s0034-3617(23)70015-5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Ultra high-rate composite deposition system on track to beat lay-up target by 75%
Mark Bowering, NCC's chief engineer for civil air structures describes how a new deposition system could reduce production costs and improve operation flexibility.