准备,设置,发射

IF 1.4 4区 工程技术 Q3 ENGINEERING, CIVIL
M. Furrer, G. Hasbrouck, Jack Yuzna
{"title":"准备,设置,发射","authors":"M. Furrer, G. Hasbrouck, Jack Yuzna","doi":"10.1061/CIEGAG.0001289","DOIUrl":null,"url":null,"abstract":"The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.","PeriodicalId":50692,"journal":{"name":"Civil Engineering","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ready, Set, Launch\",\"authors\":\"M. Furrer, G. Hasbrouck, Jack Yuzna\",\"doi\":\"10.1061/CIEGAG.0001289\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.\",\"PeriodicalId\":50692,\"journal\":{\"name\":\"Civil Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2018-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1061/CIEGAG.0001289\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1061/CIEGAG.0001289","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

在明尼阿波利斯一个非常繁忙的23条轨道铁路调车场上,用一个外观相似的新结构替换沃伦贯通桁架桥,需要预制钢桁架和创新的发射方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Ready, Set, Launch
The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Civil Engineering
Civil Engineering 工程技术-工程:土木
CiteScore
0.10
自引率
0.00%
发文量
34
审稿时长
>12 weeks
期刊介绍: Reaching an audience of more than 140,000 civil engineers worldwide, the magazine has the largest circulation within the engineering profession, providing a compelling editorial mix of: -Projects- Trends- Engineering Science- Engineering Technology- Engineering History- In-Depth Analysis of Current Issues- Public Policy- Law- Ethics.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信