分包商现金流管理的影响因素

Q3 Engineering
Medhat Abdelrahman Youssef, A. Ibrahim, M. E. El-Badawy Hafez
{"title":"分包商现金流管理的影响因素","authors":"Medhat Abdelrahman Youssef, A. Ibrahim, M. E. El-Badawy Hafez","doi":"10.28991/cej-sp2023-09-08","DOIUrl":null,"url":null,"abstract":"Objective: This study aims to define how to maintain and protect the subcontractor firms' cash flow from economic fluctuation through legally sustainable solutions. Methods/Analysis: We conducted a case study in the Eastern Delta Region of Egypt. A questionnaire containing a list of 22 impact factors on subcontractors' cash flow was distributed across multiple subcontractor firms with an 82% response rate. It was designed to explore the factors causing cash flow instability and analyze them using SPSS statistics. Findings: The study finds that inflation, late payments, non-compensation for late payments, poor subcontractor cash flow management, subcontractor firms' inclination to avoid disputes, material price fluctuation, and non-compensation terms, as well as suppliers rejection of payment delays, are the most critical factors of subcontractor cash flow problems. Novelty/Improvement:The study suggests adding three sub-articles to Article 57 in \"Tender Law\" as legally sustainable solutions to protect and maintain the firm's growth rate from inflation, late payment, and the inclination to avoid disputes. Also, the study recommends that the owner ensure that cash is available before procuring the general contractors, as stated in Egyptian Law 182 of 2018. This study will contribute to establishing a sustainable win-win relationship between subcontractors and general contractors. Doi: 10.28991/CEJ-SP2023-09-08 Full Text: PDF","PeriodicalId":53612,"journal":{"name":"Open Civil Engineering Journal","volume":"172 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Impact Factors on Subcontractor's Cash Flow Management\",\"authors\":\"Medhat Abdelrahman Youssef, A. Ibrahim, M. E. El-Badawy Hafez\",\"doi\":\"10.28991/cej-sp2023-09-08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Objective: This study aims to define how to maintain and protect the subcontractor firms' cash flow from economic fluctuation through legally sustainable solutions. Methods/Analysis: We conducted a case study in the Eastern Delta Region of Egypt. A questionnaire containing a list of 22 impact factors on subcontractors' cash flow was distributed across multiple subcontractor firms with an 82% response rate. It was designed to explore the factors causing cash flow instability and analyze them using SPSS statistics. Findings: The study finds that inflation, late payments, non-compensation for late payments, poor subcontractor cash flow management, subcontractor firms' inclination to avoid disputes, material price fluctuation, and non-compensation terms, as well as suppliers rejection of payment delays, are the most critical factors of subcontractor cash flow problems. Novelty/Improvement:The study suggests adding three sub-articles to Article 57 in \\\"Tender Law\\\" as legally sustainable solutions to protect and maintain the firm's growth rate from inflation, late payment, and the inclination to avoid disputes. Also, the study recommends that the owner ensure that cash is available before procuring the general contractors, as stated in Egyptian Law 182 of 2018. This study will contribute to establishing a sustainable win-win relationship between subcontractors and general contractors. Doi: 10.28991/CEJ-SP2023-09-08 Full Text: PDF\",\"PeriodicalId\":53612,\"journal\":{\"name\":\"Open Civil Engineering Journal\",\"volume\":\"172 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Open Civil Engineering Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.28991/cej-sp2023-09-08\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Open Civil Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.28991/cej-sp2023-09-08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 2

摘要

摘要目的:本研究旨在探讨如何透过法律上永续的解决方案,维持和保护分包商企业的现金流不受经济波动的影响。方法/分析:我们在埃及的东部三角洲地区进行了一个案例研究。一份包含22个影响分包商现金流因素的问卷在多个分包商公司中分发,回复率为82%。本研究旨在探讨造成现金流不稳定的因素,并运用SPSS统计软件进行分析。研究发现:通货膨胀、逾期付款、逾期付款不补偿、分包商现金流管理不善、分包商企业回避纠纷倾向、材料价格波动、非补偿条款以及供应商拒绝延迟付款是分包商现金流问题的最关键因素。新颖性/改进性:本研究建议在《投标法》第57条的基础上增加三个子条款,作为法律上可持续的解决方案,以保护和维持公司的增长率,免受通货膨胀、逾期付款和避免纠纷的倾向的影响。此外,该研究建议业主在采购总承包商之前确保有现金可用,如2018年埃及第182号法律所述。本研究将有助于在分包商与总承包商之间建立可持续的双赢关系。Doi: 10.28991/CEJ-SP2023-09-08全文:PDF
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact Factors on Subcontractor's Cash Flow Management
Objective: This study aims to define how to maintain and protect the subcontractor firms' cash flow from economic fluctuation through legally sustainable solutions. Methods/Analysis: We conducted a case study in the Eastern Delta Region of Egypt. A questionnaire containing a list of 22 impact factors on subcontractors' cash flow was distributed across multiple subcontractor firms with an 82% response rate. It was designed to explore the factors causing cash flow instability and analyze them using SPSS statistics. Findings: The study finds that inflation, late payments, non-compensation for late payments, poor subcontractor cash flow management, subcontractor firms' inclination to avoid disputes, material price fluctuation, and non-compensation terms, as well as suppliers rejection of payment delays, are the most critical factors of subcontractor cash flow problems. Novelty/Improvement:The study suggests adding three sub-articles to Article 57 in "Tender Law" as legally sustainable solutions to protect and maintain the firm's growth rate from inflation, late payment, and the inclination to avoid disputes. Also, the study recommends that the owner ensure that cash is available before procuring the general contractors, as stated in Egyptian Law 182 of 2018. This study will contribute to establishing a sustainable win-win relationship between subcontractors and general contractors. Doi: 10.28991/CEJ-SP2023-09-08 Full Text: PDF
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Open Civil Engineering Journal
Open Civil Engineering Journal Engineering-Civil and Structural Engineering
CiteScore
1.90
自引率
0.00%
发文量
17
期刊介绍: The Open Civil Engineering Journal is an Open Access online journal which publishes research, reviews/mini-reviews, letter articles and guest edited single topic issues in all areas of civil engineering. The Open Civil Engineering Journal, a peer-reviewed journal, is an important and reliable source of current information on developments in civil engineering. The topics covered in the journal include (but not limited to) concrete structures, construction materials, structural mechanics, soil mechanics, foundation engineering, offshore geotechnics, water resources, hydraulics, horology, coastal engineering, river engineering, ocean modeling, fluid-solid-structure interactions, offshore engineering, marine structures, constructional management and other civil engineering relevant areas.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信