Amy Styslinger, D. Yost, G. Dickerson, Antoine Minois, Renee Wiwel
{"title":"圭亚那:深水前沿的Liza一期快速开发","authors":"Amy Styslinger, D. Yost, G. Dickerson, Antoine Minois, Renee Wiwel","doi":"10.4043/31158-ms","DOIUrl":null,"url":null,"abstract":"\n The Liza Phase 1 development project, offshore Guyana, is an unique example of what the offshore oil and gas industry is capable of when working together to deliver a common objective. ExxonMobil and the Stabroek Block co-venturers, Hess Guyana Exploration Limited and CNOOC Petroleum Guyana Limited, commenced oil production from the Liza Destiny floating production, storage, and offloading (FPSO) vessel in December of 2019, less than 5 years from the initial discovery of hydrocarbons in the Staebroek block. With the production and export of its first barrels of oil, the project completed the establishment of a nascent oil and gas industry in Guyana that is poised for tremendous growth in the coming years.\n The Liza Phase 1 development consists of a 120 kbd conversion FPSO (The Liza Destiny) and a network of subsea infrastructure to produce from and inject in two drill centers. It is expected to develop a resource of about 450 MBO gross estimated ultimate recovery. The water depth ranges from 1,690–1,860 m throughout the development which is located approximately 200 km offshore Guyana.\n This paper highlights the scope and pace of the project and discusses three specific challenges overcome: the uncertainty of the metocean conditions, extending the application of the selected riser technology, and executing in a challenging and frontier offshore location. A key to the success of the project was the unified approach between stakeholders and the commitment to act as One Team.\n The Liza Phase 1 project rapidly developed a newly discovered deep water resource in a frontier location while overcoming numerous challenges. By delivering Guyana's first ever oil production among industry leading cycle times, the Liza Phase 1 project has set the foundation for the future of deep water developments in Guyana.","PeriodicalId":11072,"journal":{"name":"Day 1 Mon, August 16, 2021","volume":"54 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Guyana: Liza Phase 1 Rapid Development in a Deepwater Frontier\",\"authors\":\"Amy Styslinger, D. Yost, G. Dickerson, Antoine Minois, Renee Wiwel\",\"doi\":\"10.4043/31158-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The Liza Phase 1 development project, offshore Guyana, is an unique example of what the offshore oil and gas industry is capable of when working together to deliver a common objective. ExxonMobil and the Stabroek Block co-venturers, Hess Guyana Exploration Limited and CNOOC Petroleum Guyana Limited, commenced oil production from the Liza Destiny floating production, storage, and offloading (FPSO) vessel in December of 2019, less than 5 years from the initial discovery of hydrocarbons in the Staebroek block. With the production and export of its first barrels of oil, the project completed the establishment of a nascent oil and gas industry in Guyana that is poised for tremendous growth in the coming years.\\n The Liza Phase 1 development consists of a 120 kbd conversion FPSO (The Liza Destiny) and a network of subsea infrastructure to produce from and inject in two drill centers. It is expected to develop a resource of about 450 MBO gross estimated ultimate recovery. The water depth ranges from 1,690–1,860 m throughout the development which is located approximately 200 km offshore Guyana.\\n This paper highlights the scope and pace of the project and discusses three specific challenges overcome: the uncertainty of the metocean conditions, extending the application of the selected riser technology, and executing in a challenging and frontier offshore location. A key to the success of the project was the unified approach between stakeholders and the commitment to act as One Team.\\n The Liza Phase 1 project rapidly developed a newly discovered deep water resource in a frontier location while overcoming numerous challenges. By delivering Guyana's first ever oil production among industry leading cycle times, the Liza Phase 1 project has set the foundation for the future of deep water developments in Guyana.\",\"PeriodicalId\":11072,\"journal\":{\"name\":\"Day 1 Mon, August 16, 2021\",\"volume\":\"54 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, August 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31158-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, August 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31158-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Guyana: Liza Phase 1 Rapid Development in a Deepwater Frontier
The Liza Phase 1 development project, offshore Guyana, is an unique example of what the offshore oil and gas industry is capable of when working together to deliver a common objective. ExxonMobil and the Stabroek Block co-venturers, Hess Guyana Exploration Limited and CNOOC Petroleum Guyana Limited, commenced oil production from the Liza Destiny floating production, storage, and offloading (FPSO) vessel in December of 2019, less than 5 years from the initial discovery of hydrocarbons in the Staebroek block. With the production and export of its first barrels of oil, the project completed the establishment of a nascent oil and gas industry in Guyana that is poised for tremendous growth in the coming years.
The Liza Phase 1 development consists of a 120 kbd conversion FPSO (The Liza Destiny) and a network of subsea infrastructure to produce from and inject in two drill centers. It is expected to develop a resource of about 450 MBO gross estimated ultimate recovery. The water depth ranges from 1,690–1,860 m throughout the development which is located approximately 200 km offshore Guyana.
This paper highlights the scope and pace of the project and discusses three specific challenges overcome: the uncertainty of the metocean conditions, extending the application of the selected riser technology, and executing in a challenging and frontier offshore location. A key to the success of the project was the unified approach between stakeholders and the commitment to act as One Team.
The Liza Phase 1 project rapidly developed a newly discovered deep water resource in a frontier location while overcoming numerous challenges. By delivering Guyana's first ever oil production among industry leading cycle times, the Liza Phase 1 project has set the foundation for the future of deep water developments in Guyana.