卷绕装置金属结构的结构与尺寸研究

M. Nan, Dorina Bădiță Popescu, D. Grecea, Cosmin Vitan, Bogdan Brănișteanu
{"title":"卷绕装置金属结构的结构与尺寸研究","authors":"M. Nan, Dorina Bădiță Popescu, D. Grecea, Cosmin Vitan, Bogdan Brănișteanu","doi":"10.35219/mms.2021.2.02","DOIUrl":null,"url":null,"abstract":"The paper focuses on the design of the metal tower for the sinking of Netiș de-ventilating shaft in Râul Mare Retezat hydro-energetic setup. The analytical calculation of sizing and verification of the metal structure is doubled by the graphic simulation with speciality software, in view of obtaining results as close as possible to the real exploitation conditions of the tower. The tower of the de-ventilating shaft is considered to be a temporary construction, and its component parts will be decommissioned once the sinking is finalized. The tower is made up of metal structures in four transoms, 3 being mounted with junction plates and screws, the fourth being the roof.","PeriodicalId":22358,"journal":{"name":"The Annals of “Dunarea de Jos” University of Galati. Fascicle IX, Metallurgy and Materials Science","volume":"476 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Construction and Sizing of the Metal Structure of a Winding Installation\",\"authors\":\"M. Nan, Dorina Bădiță Popescu, D. Grecea, Cosmin Vitan, Bogdan Brănișteanu\",\"doi\":\"10.35219/mms.2021.2.02\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper focuses on the design of the metal tower for the sinking of Netiș de-ventilating shaft in Râul Mare Retezat hydro-energetic setup. The analytical calculation of sizing and verification of the metal structure is doubled by the graphic simulation with speciality software, in view of obtaining results as close as possible to the real exploitation conditions of the tower. The tower of the de-ventilating shaft is considered to be a temporary construction, and its component parts will be decommissioned once the sinking is finalized. The tower is made up of metal structures in four transoms, 3 being mounted with junction plates and screws, the fourth being the roof.\",\"PeriodicalId\":22358,\"journal\":{\"name\":\"The Annals of “Dunarea de Jos” University of Galati. Fascicle IX, Metallurgy and Materials Science\",\"volume\":\"476 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Annals of “Dunarea de Jos” University of Galati. Fascicle IX, Metallurgy and Materials Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35219/mms.2021.2.02\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Annals of “Dunarea de Jos” University of Galati. Fascicle IX, Metallurgy and Materials Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35219/mms.2021.2.02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文主要介绍了 ul - Mare - Retezat水力发电装置netipro通风竖井下沉金属塔的设计。为了使结果尽可能接近塔的实际开发情况,利用专业软件进行图形模拟,对金属结构的尺寸进行了解析计算和校核。排风竖井塔为临时建筑,一旦完成下沉,其组成部分将退役。塔楼由四个横梁的金属结构组成,其中三个横梁用连接板和螺钉安装,第四个横梁是屋顶。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on Construction and Sizing of the Metal Structure of a Winding Installation
The paper focuses on the design of the metal tower for the sinking of Netiș de-ventilating shaft in Râul Mare Retezat hydro-energetic setup. The analytical calculation of sizing and verification of the metal structure is doubled by the graphic simulation with speciality software, in view of obtaining results as close as possible to the real exploitation conditions of the tower. The tower of the de-ventilating shaft is considered to be a temporary construction, and its component parts will be decommissioned once the sinking is finalized. The tower is made up of metal structures in four transoms, 3 being mounted with junction plates and screws, the fourth being the roof.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
25
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信