埃塞俄比亚Genale - Dawa河流域恒河Gobecho微型水电站电力竞争前景评价

IF 0.3 Q4 ENGINEERING, ELECTRICAL & ELECTRONIC
A. Ayalew
{"title":"埃塞俄比亚Genale - Dawa河流域恒河Gobecho微型水电站电力竞争前景评价","authors":"A. Ayalew","doi":"10.11648/J.EPES.20211002.12","DOIUrl":null,"url":null,"abstract":"Micro hydropower helps the rural areas to supply power with off grid electrification. This study deals with the design of micro hydropower scheme in Gobecho kebele, Genale Dawa river basin, Ethiopia. The site for the construction of diversion weir is located upstream of the Ganga river in the kebele. The design were implemented based on the available hydrological data collected from 1991 to 2020 river discharge at different stations by selecting the one, which is near to the Gobecho catchment. Ererti is a station geographically near to Gobecho catchment by using GIS 10.7 application. The Gobecho peak probable discharge of 3.503m3/s is computed using log normal distribution after L-moment analysis. Based on this peak discharge, vertical drop weir and components of headwork structure designed and provided relevant dimensions. The proposed vertical drop weir has a height of 0.703m, crest length 10m and the design flow for a hydropower scheme is 0.132m3/s estimated by FDC. The water passes through trapezoidal power canal of a 0.35m width and a 0.43 height to a forebay tank. A forebay of size 9 × 1.3 × 1.7 is provided at the end of the power canal. Moreover, the water leads from forebay to a 0.24m diameter of penstock running one unit turbine and capacity of 25kw. The selected type of turbine for proposed plant is cross flow turbine. Finally, the quantity of calculated estimate cost is 50,000 USD and the B/C ratio of 1.48 provided for this micro hydropower project.","PeriodicalId":43153,"journal":{"name":"International Journal of Power and Energy Systems","volume":"284 1","pages":"25"},"PeriodicalIF":0.3000,"publicationDate":"2021-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of Power Compeers Prospective of Gobecho Micro Hydropower Plant on Ganga River, Genale Dawa River Basin, Ethiopia\",\"authors\":\"A. Ayalew\",\"doi\":\"10.11648/J.EPES.20211002.12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Micro hydropower helps the rural areas to supply power with off grid electrification. This study deals with the design of micro hydropower scheme in Gobecho kebele, Genale Dawa river basin, Ethiopia. The site for the construction of diversion weir is located upstream of the Ganga river in the kebele. The design were implemented based on the available hydrological data collected from 1991 to 2020 river discharge at different stations by selecting the one, which is near to the Gobecho catchment. Ererti is a station geographically near to Gobecho catchment by using GIS 10.7 application. The Gobecho peak probable discharge of 3.503m3/s is computed using log normal distribution after L-moment analysis. Based on this peak discharge, vertical drop weir and components of headwork structure designed and provided relevant dimensions. The proposed vertical drop weir has a height of 0.703m, crest length 10m and the design flow for a hydropower scheme is 0.132m3/s estimated by FDC. The water passes through trapezoidal power canal of a 0.35m width and a 0.43 height to a forebay tank. A forebay of size 9 × 1.3 × 1.7 is provided at the end of the power canal. Moreover, the water leads from forebay to a 0.24m diameter of penstock running one unit turbine and capacity of 25kw. The selected type of turbine for proposed plant is cross flow turbine. Finally, the quantity of calculated estimate cost is 50,000 USD and the B/C ratio of 1.48 provided for this micro hydropower project.\",\"PeriodicalId\":43153,\"journal\":{\"name\":\"International Journal of Power and Energy Systems\",\"volume\":\"284 1\",\"pages\":\"25\"},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2021-04-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Power and Energy Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11648/J.EPES.20211002.12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Power and Energy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/J.EPES.20211002.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

微水电帮助农村地区实现离网电气化供电。本文研究了埃塞俄比亚Genale Dawa河流域Gobecho kebele微型水电方案的设计。引水堰的建设地点位于恒河上游的科贝勒。根据1991年至2020年不同站点的水文资料,选择靠近Gobecho流域的站点进行设计。Ererti是一个地理上靠近Gobecho流域的站点。经l矩分析,采用对数正态分布计算出Gobecho峰值可能流量3.503m3/s。在此基础上,设计了垂直落差堰及水头结构部件,并给出了相应的尺寸。拟建垂直落差堰高0.703m,坝顶长10m, FDC估算某水电方案设计流量0.132m3/s。水通过宽0.35米、高0.43米的梯形动力渠,进入前湾水箱。功率管末端设有9 × 1.3 × 1.7尺寸的前凹。此外,水从前湾引入直径0.24米的压力管道,运行一台机组涡轮机,容量为25千瓦。拟建电厂选用的水轮机类型为横流水轮机。最后,计算估算成本的金额为5万美元,为该微型水电项目提供的B/C比为1.48。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of Power Compeers Prospective of Gobecho Micro Hydropower Plant on Ganga River, Genale Dawa River Basin, Ethiopia
Micro hydropower helps the rural areas to supply power with off grid electrification. This study deals with the design of micro hydropower scheme in Gobecho kebele, Genale Dawa river basin, Ethiopia. The site for the construction of diversion weir is located upstream of the Ganga river in the kebele. The design were implemented based on the available hydrological data collected from 1991 to 2020 river discharge at different stations by selecting the one, which is near to the Gobecho catchment. Ererti is a station geographically near to Gobecho catchment by using GIS 10.7 application. The Gobecho peak probable discharge of 3.503m3/s is computed using log normal distribution after L-moment analysis. Based on this peak discharge, vertical drop weir and components of headwork structure designed and provided relevant dimensions. The proposed vertical drop weir has a height of 0.703m, crest length 10m and the design flow for a hydropower scheme is 0.132m3/s estimated by FDC. The water passes through trapezoidal power canal of a 0.35m width and a 0.43 height to a forebay tank. A forebay of size 9 × 1.3 × 1.7 is provided at the end of the power canal. Moreover, the water leads from forebay to a 0.24m diameter of penstock running one unit turbine and capacity of 25kw. The selected type of turbine for proposed plant is cross flow turbine. Finally, the quantity of calculated estimate cost is 50,000 USD and the B/C ratio of 1.48 provided for this micro hydropower project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Power and Energy Systems
International Journal of Power and Energy Systems ENGINEERING, ELECTRICAL & ELECTRONIC-
CiteScore
1.00
自引率
0.00%
发文量
5
期刊介绍: First published in 1972, this journal serves a worldwide readership of power and energy professionals. As one of the premier referred publications in the field, this journal strives to be the first to explore emerging energy issues, featuring only papers of the highest scientific merit. The subject areas of this journal include power transmission, distribution and generation, electric power quality, education, energy development, competition and regulation, power electronics, communication, electric machinery, power engineering systems, protection, reliability and security, energy management systems and supervisory control, economics, dispatching and scheduling, energy systems modelling and simulation, alternative energy sources, policy and planning.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信