{"title":"曼尼托巴水电公司高压测试设施的电力变压器测试","authors":"W. McDermid, J. Lambert","doi":"10.1109/ICHVE.2012.6357061","DOIUrl":null,"url":null,"abstract":"Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.","PeriodicalId":6375,"journal":{"name":"2012 International Conference on High Voltage Engineering and Application","volume":"159 1","pages":"92-94"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Power transformer testing at Manitoba Hydro's high voltage test facility\",\"authors\":\"W. McDermid, J. Lambert\",\"doi\":\"10.1109/ICHVE.2012.6357061\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.\",\"PeriodicalId\":6375,\"journal\":{\"name\":\"2012 International Conference on High Voltage Engineering and Application\",\"volume\":\"159 1\",\"pages\":\"92-94\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-11-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 International Conference on High Voltage Engineering and Application\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICHVE.2012.6357061\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on High Voltage Engineering and Application","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHVE.2012.6357061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Power transformer testing at Manitoba Hydro's high voltage test facility
Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.