{"title":"曼尼托巴水电公司高压测试设施的电力变压器测试","authors":"W. McDermid, J. Lambert","doi":"10.1109/ICHVE.2012.6357061","DOIUrl":null,"url":null,"abstract":"Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.","PeriodicalId":6375,"journal":{"name":"2012 International Conference on High Voltage Engineering and Application","volume":"159 1","pages":"92-94"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Power transformer testing at Manitoba Hydro's high voltage test facility\",\"authors\":\"W. McDermid, J. Lambert\",\"doi\":\"10.1109/ICHVE.2012.6357061\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.\",\"PeriodicalId\":6375,\"journal\":{\"name\":\"2012 International Conference on High Voltage Engineering and Application\",\"volume\":\"159 1\",\"pages\":\"92-94\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-11-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 International Conference on High Voltage Engineering and Application\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICHVE.2012.6357061\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on High Voltage Engineering and Application","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHVE.2012.6357061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

马尼托巴水电公司建造了一个高压测试设施,用于对额定电压高达550千伏伏和500千伏伏的设备进行全面电气测试。该项目的第二阶段是增加一个测试系统,用于高达310 MVA的三相电力变压器和高达400 MVA的单相电力变压器。该测试系统是基于电压源转换器,并包括补偿,以方便负载损失测试。本文就工作的各个方面提供了一些细节。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Power transformer testing at Manitoba Hydro's high voltage test facility
Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信