尼日利亚原型水电站开发的技术经济分析

M. Bolarinwa, Abdulrahman A. Adeyemi, Oluwasolamidotun E. Kassim
{"title":"尼日利亚原型水电站开发的技术经济分析","authors":"M. Bolarinwa, Abdulrahman A. Adeyemi, Oluwasolamidotun E. Kassim","doi":"10.24018/ejeng.2023.8.3.2972","DOIUrl":null,"url":null,"abstract":"Epileptic power supply in Nigeria has caused hindrances to her growth. Electricity is required for technological advancement and economic growth, as business transactions and most activities depend on its availability. This work was aimed at developing a prototype hydropower plant for use in riverine area(s) for electricity generation. Using Autodesk inventor software, the required turbine was designed and thereafter fabricated and assembled appropriately with all necessary components. Stress analyses (Von Mises, first, and third principal stresses) were also conducted to determine the turbine load bearing capacity. The e system was fitted into the edge of a stream (with minimum debris and cataract to prevent and reduce the blades from wear and tear) and arranged such that the blades were at an appropriate angle of attack to capture the water's kinetic energy. The turbine possessed eight blades, designed and fabricated to function in a river with low volume. On assembling the turbine with frame, gears, ball bearing and shaft, a pico-hydropower plant was developed. Stress analyses indicated Von Mises; first; and third principal stresses to respectively be: (0.00000498617; -0.00316625; and -0.0259764) MPa for minimum values and (0.0382339; 0.0452009; and 0.00873272) MPa for maximum values, indicating that the turbine can withstand operating conditions like pressure, force and friction. On testing, voltage readings were 0.90, 0.93, 0.96, 0.98 and 1.00 volts respectively. It was found to be portable and economical. The locally developed hydropower plant will be useful for solving electrification problems in rural areas, farm settlements and off-grid homes.","PeriodicalId":12001,"journal":{"name":"European Journal of Engineering and Technology Research","volume":"2 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Technoeconomic Analysis of Prototype Hydropower Plant Development in Nigeria\",\"authors\":\"M. Bolarinwa, Abdulrahman A. Adeyemi, Oluwasolamidotun E. Kassim\",\"doi\":\"10.24018/ejeng.2023.8.3.2972\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Epileptic power supply in Nigeria has caused hindrances to her growth. Electricity is required for technological advancement and economic growth, as business transactions and most activities depend on its availability. This work was aimed at developing a prototype hydropower plant for use in riverine area(s) for electricity generation. Using Autodesk inventor software, the required turbine was designed and thereafter fabricated and assembled appropriately with all necessary components. Stress analyses (Von Mises, first, and third principal stresses) were also conducted to determine the turbine load bearing capacity. The e system was fitted into the edge of a stream (with minimum debris and cataract to prevent and reduce the blades from wear and tear) and arranged such that the blades were at an appropriate angle of attack to capture the water's kinetic energy. The turbine possessed eight blades, designed and fabricated to function in a river with low volume. On assembling the turbine with frame, gears, ball bearing and shaft, a pico-hydropower plant was developed. Stress analyses indicated Von Mises; first; and third principal stresses to respectively be: (0.00000498617; -0.00316625; and -0.0259764) MPa for minimum values and (0.0382339; 0.0452009; and 0.00873272) MPa for maximum values, indicating that the turbine can withstand operating conditions like pressure, force and friction. On testing, voltage readings were 0.90, 0.93, 0.96, 0.98 and 1.00 volts respectively. It was found to be portable and economical. The locally developed hydropower plant will be useful for solving electrification problems in rural areas, farm settlements and off-grid homes.\",\"PeriodicalId\":12001,\"journal\":{\"name\":\"European Journal of Engineering and Technology Research\",\"volume\":\"2 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Engineering and Technology Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24018/ejeng.2023.8.3.2972\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Engineering and Technology Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24018/ejeng.2023.8.3.2972","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

尼日利亚的癫痫电力供应阻碍了她的成长。电力是技术进步和经济增长所必需的,因为商业交易和大多数活动都依赖于电力的供应。这项工作的目的是研制一种用于河滨地区发电的原型水力发电厂。使用Autodesk inventor软件,所需的涡轮机被设计,然后制造和组装适当的所有必要的组件。还进行了应力分析(Von Mises,第一主应力和第三主应力)以确定涡轮机的承载能力。该系统安装在溪流的边缘(最小的碎片和白内障,以防止和减少叶片的磨损),并安排使叶片处于适当的迎角,以捕获水的动能。涡轮机拥有8个叶片,设计和制造是为了在小体积的河流中运行。将水轮机与机座、齿轮、滚珠轴承和轴组装在一起,研制了微型水电厂。应力分析表明Von Mises;第一个;第三主应力分别为:(0.00000498617;-0.00316625;和-0.0259764)MPa的最小值和(0.0382339;0.0452009;和0.00873272)MPa为最大值,表明涡轮能够承受压力、力和摩擦等工况。在测试中,电压读数分别为0.90、0.93、0.96、0.98和1.00伏。人们发现它既轻便又经济。当地开发的水电站将有助于解决农村地区、农场定居点和离网家庭的电气化问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Technoeconomic Analysis of Prototype Hydropower Plant Development in Nigeria
Epileptic power supply in Nigeria has caused hindrances to her growth. Electricity is required for technological advancement and economic growth, as business transactions and most activities depend on its availability. This work was aimed at developing a prototype hydropower plant for use in riverine area(s) for electricity generation. Using Autodesk inventor software, the required turbine was designed and thereafter fabricated and assembled appropriately with all necessary components. Stress analyses (Von Mises, first, and third principal stresses) were also conducted to determine the turbine load bearing capacity. The e system was fitted into the edge of a stream (with minimum debris and cataract to prevent and reduce the blades from wear and tear) and arranged such that the blades were at an appropriate angle of attack to capture the water's kinetic energy. The turbine possessed eight blades, designed and fabricated to function in a river with low volume. On assembling the turbine with frame, gears, ball bearing and shaft, a pico-hydropower plant was developed. Stress analyses indicated Von Mises; first; and third principal stresses to respectively be: (0.00000498617; -0.00316625; and -0.0259764) MPa for minimum values and (0.0382339; 0.0452009; and 0.00873272) MPa for maximum values, indicating that the turbine can withstand operating conditions like pressure, force and friction. On testing, voltage readings were 0.90, 0.93, 0.96, 0.98 and 1.00 volts respectively. It was found to be portable and economical. The locally developed hydropower plant will be useful for solving electrification problems in rural areas, farm settlements and off-grid homes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信