{"title":"具有模糊活动持续时间的项目调度问题:一种新的基于运维律的解决框架","authors":"Mingxuan Zhao, Jian Zhou, Ke Wang, A. Pantelous","doi":"10.2139/ssrn.4170706","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":11868,"journal":{"name":"Eur. J. Oper. Res.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Project scheduling problem with fuzzy activity durations: A novel operational law based solution framework\",\"authors\":\"Mingxuan Zhao, Jian Zhou, Ke Wang, A. Pantelous\",\"doi\":\"10.2139/ssrn.4170706\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":11868,\"journal\":{\"name\":\"Eur. J. Oper. Res.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Eur. J. Oper. Res.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.4170706\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eur. J. Oper. Res.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.4170706","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}