{"title":"新技术解决了连续油管固井的问题","authors":"R. B. Carpenter","doi":"10.2118/20426-PA","DOIUrl":null,"url":null,"abstract":"Coiled-tubing cementing has been practiced successfully on the Alaskan North Slope for several years. This paper discusses the special problems faced when this technology was applied to offshore U.S. gulf coast operations. The innovative solutions and procedures developed to improve the economic and technical success of coiled-tubing cementing are also discussed. Comparative laboratory and computer studies, as well as field case histories, will be presented to show the economic merit of this technology.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"63 1","pages":"137-143"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"New technologies address the problem areas of coiled-tubing cementing\",\"authors\":\"R. B. Carpenter\",\"doi\":\"10.2118/20426-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Coiled-tubing cementing has been practiced successfully on the Alaskan North Slope for several years. This paper discusses the special problems faced when this technology was applied to offshore U.S. gulf coast operations. The innovative solutions and procedures developed to improve the economic and technical success of coiled-tubing cementing are also discussed. Comparative laboratory and computer studies, as well as field case histories, will be presented to show the economic merit of this technology.\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"63 1\",\"pages\":\"137-143\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/20426-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/20426-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

连续油管固井在阿拉斯加北坡已经成功实施了几年。本文讨论了该技术应用于美国墨西哥湾近海作业时所面临的特殊问题。本文还讨论了为提高连续油管固井的经济和技术成功率而开发的创新解决方案和程序。比较实验室和计算机研究,以及现场案例历史,将提出,以显示该技术的经济价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
New technologies address the problem areas of coiled-tubing cementing
Coiled-tubing cementing has been practiced successfully on the Alaskan North Slope for several years. This paper discusses the special problems faced when this technology was applied to offshore U.S. gulf coast operations. The innovative solutions and procedures developed to improve the economic and technical success of coiled-tubing cementing are also discussed. Comparative laboratory and computer studies, as well as field case histories, will be presented to show the economic merit of this technology.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信