在马来西亚深水高速完井中应用井下防砂

E. Samuel, Mohd Faizal Yusoff, P. Bee, A. Hakam, Kasim B. Selamat, James Stevenson, N. Nopsiri
{"title":"在马来西亚深水高速完井中应用井下防砂","authors":"E. Samuel, Mohd Faizal Yusoff, P. Bee, A. Hakam, Kasim B. Selamat, James Stevenson, N. Nopsiri","doi":"10.4043/31413-ms","DOIUrl":null,"url":null,"abstract":"\n Designing and delivering a successful completion in a Subsea High Rate Gas Deepwater environment is known to be one of the most challenging aspects of a Field Development.\n For the specific case of high rate gas wells with reservoirs requiring sand control, it makes the completion reliability and longevity an uncompromising prerequisite, as it is well known that formation solids moving at high velocity through the wellbore can drastically affect the functionality and integrity of downhole equipment as well as the subsurface and production facilities. In addition, to the previously mentioned aspects, the complexities and costs associated with Well reentries and Workovers in a Subsea Deepwater environment can quickly erode the overall financial viability of a development program.\n This paper covers the sand control design and execution techniques applied to four (4) High Rate Gas Wells in the PTTEP's Block H Development in the Malaysian Deepwater region of Sabah, between 2020 and 2021.","PeriodicalId":11011,"journal":{"name":"Day 3 Thu, March 24, 2022","volume":"362 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Applying Downhole Sand Control for High Rate Gas Completions in Deepwater Malaysia\",\"authors\":\"E. Samuel, Mohd Faizal Yusoff, P. Bee, A. Hakam, Kasim B. Selamat, James Stevenson, N. Nopsiri\",\"doi\":\"10.4043/31413-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Designing and delivering a successful completion in a Subsea High Rate Gas Deepwater environment is known to be one of the most challenging aspects of a Field Development.\\n For the specific case of high rate gas wells with reservoirs requiring sand control, it makes the completion reliability and longevity an uncompromising prerequisite, as it is well known that formation solids moving at high velocity through the wellbore can drastically affect the functionality and integrity of downhole equipment as well as the subsurface and production facilities. In addition, to the previously mentioned aspects, the complexities and costs associated with Well reentries and Workovers in a Subsea Deepwater environment can quickly erode the overall financial viability of a development program.\\n This paper covers the sand control design and execution techniques applied to four (4) High Rate Gas Wells in the PTTEP's Block H Development in the Malaysian Deepwater region of Sabah, between 2020 and 2021.\",\"PeriodicalId\":11011,\"journal\":{\"name\":\"Day 3 Thu, March 24, 2022\",\"volume\":\"362 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, March 24, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31413-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31413-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

众所周知,在深水高速率天然气环境中设计和交付成功的完井是油田开发中最具挑战性的方面之一。对于需要防砂的高产量气井来说,完井的可靠性和寿命是一个不容忽视的先决条件,因为众所周知,地层固体在井筒中的高速移动会严重影响井下设备以及地下和生产设施的功能和完整性。此外,除了前面提到的几个方面之外,在深水环境中,与回入井和修井相关的复杂性和成本会迅速侵蚀开发项目的整体财务可行性。本文介绍了2020年至2021年期间,PTTEP在马来西亚深水地区H区块开发的4口高速率气井的防砂设计和执行技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Applying Downhole Sand Control for High Rate Gas Completions in Deepwater Malaysia
Designing and delivering a successful completion in a Subsea High Rate Gas Deepwater environment is known to be one of the most challenging aspects of a Field Development. For the specific case of high rate gas wells with reservoirs requiring sand control, it makes the completion reliability and longevity an uncompromising prerequisite, as it is well known that formation solids moving at high velocity through the wellbore can drastically affect the functionality and integrity of downhole equipment as well as the subsurface and production facilities. In addition, to the previously mentioned aspects, the complexities and costs associated with Well reentries and Workovers in a Subsea Deepwater environment can quickly erode the overall financial viability of a development program. This paper covers the sand control design and execution techniques applied to four (4) High Rate Gas Wells in the PTTEP's Block H Development in the Malaysian Deepwater region of Sabah, between 2020 and 2021.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信