{"title":"确保大直径总水管未来的可靠性","authors":"David J. Tanzi, Jan Chwiedosiuk","doi":"10.1002/opfl.1858","DOIUrl":null,"url":null,"abstract":"A proactive condition assessment was conducted to ensure the long‐term integrity and viability of a critical raw water pipeline, preventing a potential failure and loss of service.","PeriodicalId":87333,"journal":{"name":"Opflow","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ensuring the Future Reliability of a Large‐Diameter Water Main\",\"authors\":\"David J. Tanzi, Jan Chwiedosiuk\",\"doi\":\"10.1002/opfl.1858\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A proactive condition assessment was conducted to ensure the long‐term integrity and viability of a critical raw water pipeline, preventing a potential failure and loss of service.\",\"PeriodicalId\":87333,\"journal\":{\"name\":\"Opflow\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Opflow\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/opfl.1858\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Opflow","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/opfl.1858","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Ensuring the Future Reliability of a Large‐Diameter Water Main
A proactive condition assessment was conducted to ensure the long‐term integrity and viability of a critical raw water pipeline, preventing a potential failure and loss of service.