{"title":"多资源车间调度集成方法的扩展","authors":"S. Dauzére-Pérés, C. Pavageau","doi":"10.1109/TSMCC.2003.814036","DOIUrl":null,"url":null,"abstract":"In a previous work, we proposed an integrated approach for a rather general shop scheduling problem, with multiresource, flexibility, and nonlinear routings. In this paper, we want to overcome some of the limitations of the approach. In particular, an operation that needs several resources might not need all the resources during its entire processing time. Our first extension allows a resource to be released before the end of the operation. The second extension considers the fact that, for a given operation, one might have to prevent a set of incompatible resources to be chosen.","PeriodicalId":55005,"journal":{"name":"IEEE Transactions on Systems Man and Cybernetics Part C-Applications and Re","volume":"216 1","pages":"207-213"},"PeriodicalIF":0.0000,"publicationDate":"2003-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Extensions of an integrated approach for multi-resource shop scheduling\",\"authors\":\"S. Dauzére-Pérés, C. Pavageau\",\"doi\":\"10.1109/TSMCC.2003.814036\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a previous work, we proposed an integrated approach for a rather general shop scheduling problem, with multiresource, flexibility, and nonlinear routings. In this paper, we want to overcome some of the limitations of the approach. In particular, an operation that needs several resources might not need all the resources during its entire processing time. Our first extension allows a resource to be released before the end of the operation. The second extension considers the fact that, for a given operation, one might have to prevent a set of incompatible resources to be chosen.\",\"PeriodicalId\":55005,\"journal\":{\"name\":\"IEEE Transactions on Systems Man and Cybernetics Part C-Applications and Re\",\"volume\":\"216 1\",\"pages\":\"207-213\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Systems Man and Cybernetics Part C-Applications and Re\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TSMCC.2003.814036\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Systems Man and Cybernetics Part C-Applications and Re","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TSMCC.2003.814036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Extensions of an integrated approach for multi-resource shop scheduling
In a previous work, we proposed an integrated approach for a rather general shop scheduling problem, with multiresource, flexibility, and nonlinear routings. In this paper, we want to overcome some of the limitations of the approach. In particular, an operation that needs several resources might not need all the resources during its entire processing time. Our first extension allows a resource to be released before the end of the operation. The second extension considers the fact that, for a given operation, one might have to prevent a set of incompatible resources to be chosen.