{"title":"具有退化效应和退化维修活动的松弛到期窗口分配调度问题","authors":"Xue Jia, Dan-Yang Lv, Yang Hu, Ji-Bo Wang, Zhi Wang, Ershen Wang","doi":"10.1142/s0217595922500051","DOIUrl":null,"url":null,"abstract":"This paper studies the slack due-window assignment scheduling problem with deterioration effects and a deterioration maintenance activity on a single-machine. The machine deteriorates during the machining process, and at a certain moment performs a deterioration maintenance activity, that is, the duration time of the maintenance activity is a linear function of the maintenance starting time. It is needed to make a decision on when to schedule the deteriorating maintenance activity, the optimal common flow allowances and the sequence of jobs to minimize the weighted penalties for the sum of earliness and tardiness, weighted number of early and delayed, and weighted due-window starting time and size. This paper proposes a polynomial time algorithm to solve this problem.","PeriodicalId":8478,"journal":{"name":"Asia Pac. J. Oper. Res.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity\",\"authors\":\"Xue Jia, Dan-Yang Lv, Yang Hu, Ji-Bo Wang, Zhi Wang, Ershen Wang\",\"doi\":\"10.1142/s0217595922500051\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies the slack due-window assignment scheduling problem with deterioration effects and a deterioration maintenance activity on a single-machine. The machine deteriorates during the machining process, and at a certain moment performs a deterioration maintenance activity, that is, the duration time of the maintenance activity is a linear function of the maintenance starting time. It is needed to make a decision on when to schedule the deteriorating maintenance activity, the optimal common flow allowances and the sequence of jobs to minimize the weighted penalties for the sum of earliness and tardiness, weighted number of early and delayed, and weighted due-window starting time and size. This paper proposes a polynomial time algorithm to solve this problem.\",\"PeriodicalId\":8478,\"journal\":{\"name\":\"Asia Pac. J. Oper. Res.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Asia Pac. J. Oper. Res.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1142/s0217595922500051\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asia Pac. J. Oper. Res.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/s0217595922500051","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

研究了单机上具有劣化效应和劣化维修活动的松弛窗分配调度问题。机床在加工过程中发生劣化,在某一时刻进行劣化维修活动,即维修活动的持续时间是维修开始时间的线性函数。需要决定何时安排日益恶化的维护活动、最优的公共流允许量和作业顺序,以使提前和延迟总和的加权惩罚最小化、提前和延迟的加权数量最小化、加权延迟窗口启动时间和大小最小化。本文提出了一种多项式时间算法来解决这一问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity
This paper studies the slack due-window assignment scheduling problem with deterioration effects and a deterioration maintenance activity on a single-machine. The machine deteriorates during the machining process, and at a certain moment performs a deterioration maintenance activity, that is, the duration time of the maintenance activity is a linear function of the maintenance starting time. It is needed to make a decision on when to schedule the deteriorating maintenance activity, the optimal common flow allowances and the sequence of jobs to minimize the weighted penalties for the sum of earliness and tardiness, weighted number of early and delayed, and weighted due-window starting time and size. This paper proposes a polynomial time algorithm to solve this problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信