{"title":"项目管理的探索性研究","authors":"A. Arteaga, J. Mariño, Kerstin Bremser, Edmundo R. Lizarzaburu","doi":"10.36561/ing.17.5","DOIUrl":null,"url":null,"abstract":"Several authors argue that project management is conducted with quantitative techniques that correspond to a linear cause-effect behavior; however, it should be treated with techniques that correspond to a nonlinear cause and effect behavior. This study explores the behavior of project management under a non-linear cause-effect approach using chaos theory and four project management variables: time, human resources, quality, and cost. Parkinson's law and chaos theory are used; mathematical equations are formulated to explain nonlinear cause-effect behavior in project management. The study was conducted considering the experience of management in mining projects. The mathematical model found can be used by academics to deepen the analysis of the reasons for the complexity of project management. Also, this study is useful for managers in making decisions to calculate the expected duration of the project.","PeriodicalId":42925,"journal":{"name":"Memoria Investigaciones en Ingenieria","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Estudio exploratorio en gestión de proyectos\",\"authors\":\"A. Arteaga, J. Mariño, Kerstin Bremser, Edmundo R. Lizarzaburu\",\"doi\":\"10.36561/ing.17.5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Several authors argue that project management is conducted with quantitative techniques that correspond to a linear cause-effect behavior; however, it should be treated with techniques that correspond to a nonlinear cause and effect behavior. This study explores the behavior of project management under a non-linear cause-effect approach using chaos theory and four project management variables: time, human resources, quality, and cost. Parkinson's law and chaos theory are used; mathematical equations are formulated to explain nonlinear cause-effect behavior in project management. The study was conducted considering the experience of management in mining projects. The mathematical model found can be used by academics to deepen the analysis of the reasons for the complexity of project management. Also, this study is useful for managers in making decisions to calculate the expected duration of the project.\",\"PeriodicalId\":42925,\"journal\":{\"name\":\"Memoria Investigaciones en Ingenieria\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2019-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Memoria Investigaciones en Ingenieria\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36561/ing.17.5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Memoria Investigaciones en Ingenieria","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36561/ing.17.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 1

摘要

一些作者认为,项目管理是用定量技术进行的,与线性因果行为相对应;然而,它应该用与非线性因果行为相对应的技术来处理。本文运用混沌理论和时间、人力资源、质量、成本四个项目管理变量,探讨了非线性因果关系下的项目管理行为。运用了帕金森定律和混沌理论;建立了数学方程来解释项目管理中的非线性因果行为。这项研究是根据采矿项目的管理经验进行的。建立的数学模型可以为学者们深入分析项目管理复杂性的原因提供理论依据。同时,本研究对管理人员计算项目预期持续时间的决策也有帮助。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Estudio exploratorio en gestión de proyectos
Several authors argue that project management is conducted with quantitative techniques that correspond to a linear cause-effect behavior; however, it should be treated with techniques that correspond to a nonlinear cause and effect behavior. This study explores the behavior of project management under a non-linear cause-effect approach using chaos theory and four project management variables: time, human resources, quality, and cost. Parkinson's law and chaos theory are used; mathematical equations are formulated to explain nonlinear cause-effect behavior in project management. The study was conducted considering the experience of management in mining projects. The mathematical model found can be used by academics to deepen the analysis of the reasons for the complexity of project management. Also, this study is useful for managers in making decisions to calculate the expected duration of the project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Memoria Investigaciones en Ingenieria
Memoria Investigaciones en Ingenieria ENGINEERING, MULTIDISCIPLINARY-
自引率
0.00%
发文量
6
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信