扎拉格尔泽格试验场战略分析

K. Szabó, L. Szabó, Á. Csanádi
{"title":"扎拉格尔泽格试验场战略分析","authors":"K. Szabó, L. Szabó, Á. Csanádi","doi":"10.5937/jemc2001038s","DOIUrl":null,"url":null,"abstract":"The investment of the Zalaegerszeg Proving Ground was finalized by a government decree - nr. 1292/2016. (VI. 13.) - which was a final result of a 2-year-long teamwork on the overall preparation, resource management and other return analysis calculations. The construction began in 2017, after which the first phase was finished in 2018 - as it was previously planned - while the final date for development is scheduled for the end of 2020. The current paper will outline the future alternatives for the proving ground in the field of the possible operation and return on investment performance from the strategic side. The most important goal of the analysis was to explore the potential outputs of the investment, which gives us a better insight into the economic, social and other effects of the test track.","PeriodicalId":31704,"journal":{"name":"Journal of Engineering Management and Competitiveness","volume":"28 1","pages":"38-47"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Strategic analysis of Zalaegerszeg Proving Ground\",\"authors\":\"K. Szabó, L. Szabó, Á. Csanádi\",\"doi\":\"10.5937/jemc2001038s\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The investment of the Zalaegerszeg Proving Ground was finalized by a government decree - nr. 1292/2016. (VI. 13.) - which was a final result of a 2-year-long teamwork on the overall preparation, resource management and other return analysis calculations. The construction began in 2017, after which the first phase was finished in 2018 - as it was previously planned - while the final date for development is scheduled for the end of 2020. The current paper will outline the future alternatives for the proving ground in the field of the possible operation and return on investment performance from the strategic side. The most important goal of the analysis was to explore the potential outputs of the investment, which gives us a better insight into the economic, social and other effects of the test track.\",\"PeriodicalId\":31704,\"journal\":{\"name\":\"Journal of Engineering Management and Competitiveness\",\"volume\":\"28 1\",\"pages\":\"38-47\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Management and Competitiveness\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/jemc2001038s\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Management and Competitiveness","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/jemc2001038s","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

zalaegerzeg试验场的投资是由政府法令1292/2016确定的。(VI. 13.)——这是经过2年的整体准备、资源管理和其他回报分析计算的团队合作的最终结果。该项目于2017年开始建设,之后按照先前的计划,第一阶段于2018年完成,而最终开发日期定于2020年底。本文将从战略角度概述未来试验场的可能运营和投资回报。分析的最重要目标是探索投资的潜在产出,这使我们更好地了解测试轨道的经济、社会和其他影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Strategic analysis of Zalaegerszeg Proving Ground
The investment of the Zalaegerszeg Proving Ground was finalized by a government decree - nr. 1292/2016. (VI. 13.) - which was a final result of a 2-year-long teamwork on the overall preparation, resource management and other return analysis calculations. The construction began in 2017, after which the first phase was finished in 2018 - as it was previously planned - while the final date for development is scheduled for the end of 2020. The current paper will outline the future alternatives for the proving ground in the field of the possible operation and return on investment performance from the strategic side. The most important goal of the analysis was to explore the potential outputs of the investment, which gives us a better insight into the economic, social and other effects of the test track.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
7
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信