{"title":"基于模糊解释结构模型的印尼BOT收费公路投资项目风险排序","authors":"Andreas Pramudya, A. Wibowo","doi":"10.5130/ajceb.v22i4.8091","DOIUrl":null,"url":null,"abstract":"The Government of Indonesia implemented the Build, Operate, and Transfer (BOT) model, relying on private investment to bridge the financing gap in developing public infrastructure facilities, including toll roads. Toll road investments, like other greenfield infrastructure projects, are typically characterized by high project risk, which discourages private sector investment. Many previous studies have investigated the various risk events in toll road investment projects, but only a few have assessed the interrelationships of risk events in the Indonesian context. This study fills this knowledge gap by determining which risk event influences other events most. Fuzzy interpretive structural modelling combined with the matrix impact of cross-references multiplication applied to a classification method was used to determine the hierarchy of risk events and analyze their influences on other risk events. A total of fourteen risk events were identified and analyzed. An unclear output specification was found to be the most significant risk event, with the biggest driving power affecting other risks. The findings and limitations of this study point the way forward for future research.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":"18 1","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2022-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ranking Risks of BOT Toll Road Investment Projects in Indonesia Using Fuzzy Interpretive Structural Modelling\",\"authors\":\"Andreas Pramudya, A. Wibowo\",\"doi\":\"10.5130/ajceb.v22i4.8091\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Government of Indonesia implemented the Build, Operate, and Transfer (BOT) model, relying on private investment to bridge the financing gap in developing public infrastructure facilities, including toll roads. Toll road investments, like other greenfield infrastructure projects, are typically characterized by high project risk, which discourages private sector investment. Many previous studies have investigated the various risk events in toll road investment projects, but only a few have assessed the interrelationships of risk events in the Indonesian context. This study fills this knowledge gap by determining which risk event influences other events most. Fuzzy interpretive structural modelling combined with the matrix impact of cross-references multiplication applied to a classification method was used to determine the hierarchy of risk events and analyze their influences on other risk events. A total of fourteen risk events were identified and analyzed. An unclear output specification was found to be the most significant risk event, with the biggest driving power affecting other risks. The findings and limitations of this study point the way forward for future research.\",\"PeriodicalId\":51729,\"journal\":{\"name\":\"Construction Economics and Building\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2022-11-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Economics and Building\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5130/ajceb.v22i4.8091\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/ajceb.v22i4.8091","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Ranking Risks of BOT Toll Road Investment Projects in Indonesia Using Fuzzy Interpretive Structural Modelling
The Government of Indonesia implemented the Build, Operate, and Transfer (BOT) model, relying on private investment to bridge the financing gap in developing public infrastructure facilities, including toll roads. Toll road investments, like other greenfield infrastructure projects, are typically characterized by high project risk, which discourages private sector investment. Many previous studies have investigated the various risk events in toll road investment projects, but only a few have assessed the interrelationships of risk events in the Indonesian context. This study fills this knowledge gap by determining which risk event influences other events most. Fuzzy interpretive structural modelling combined with the matrix impact of cross-references multiplication applied to a classification method was used to determine the hierarchy of risk events and analyze their influences on other risk events. A total of fourteen risk events were identified and analyzed. An unclear output specification was found to be the most significant risk event, with the biggest driving power affecting other risks. The findings and limitations of this study point the way forward for future research.
期刊介绍:
Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.