{"title":"分析变压器过载对珊瑚PT. PLN (PERSERO)彩虹反转的影响","authors":"Jeckson Jeckson, Azis Prayuda, Yenni Afrida","doi":"10.36269/jtr.v4i1.986","DOIUrl":null,"url":null,"abstract":"Transformer overload occurs in one of the distribution transformers in PT. PLN (Persero) ULP Karang,namely the K622 Distribution Transformer at the Rainbow Feeder with a load of 110.16% exceeding the standard set by SPLN, which is 80%. This study aims to find out how to overcome the Overload problem in the K622 distribution substation transformer on The Rainbow and get the size of the K622 distribution substation transformer load before and after the Uprating Transformer. From the results of uprating, the percentage of transformer loading value before uprating transformers was carried out by 110.16% and after uprating transformers by 26.38% so that it decreased by 83.78%. This means that the uprating transformer is one of the methods that can be used to overcome excess loads.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS DAMPAK OVERLOAD TRANSFORMATOR TERHADAP KUALITAS DAYA GARDU K622 PENYULANG PELANGI PT. PLN ( PERSERO ) ULP KARANG\",\"authors\":\"Jeckson Jeckson, Azis Prayuda, Yenni Afrida\",\"doi\":\"10.36269/jtr.v4i1.986\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Transformer overload occurs in one of the distribution transformers in PT. PLN (Persero) ULP Karang,namely the K622 Distribution Transformer at the Rainbow Feeder with a load of 110.16% exceeding the standard set by SPLN, which is 80%. This study aims to find out how to overcome the Overload problem in the K622 distribution substation transformer on The Rainbow and get the size of the K622 distribution substation transformer load before and after the Uprating Transformer. From the results of uprating, the percentage of transformer loading value before uprating transformers was carried out by 110.16% and after uprating transformers by 26.38% so that it decreased by 83.78%. This means that the uprating transformer is one of the methods that can be used to overcome excess loads.\",\"PeriodicalId\":31626,\"journal\":{\"name\":\"Volt Jurnal Ilmiah Pendidikan Teknik Elektro\",\"volume\":\"8 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volt Jurnal Ilmiah Pendidikan Teknik Elektro\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36269/jtr.v4i1.986\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36269/jtr.v4i1.986","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT. PLN (Persero) ULP Karang的其中一台配电变压器发生变压器过载,即彩虹馈线处的K622配电变压器,其负荷超出SPLN规定的80%的标准110.16%。本研究旨在找出如何克服彩虹号上K622配电变电站变压器的过载问题,得到升级变压器前后K622配电变电站变压器负荷的大小。从升级结果来看,变压器升级前和升级后的负荷值分别占比分别为110.16%和26.38%,降低了83.78%。这意味着升级变压器是可以用来克服过载的方法之一。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS DAMPAK OVERLOAD TRANSFORMATOR TERHADAP KUALITAS DAYA GARDU K622 PENYULANG PELANGI PT. PLN ( PERSERO ) ULP KARANG
Transformer overload occurs in one of the distribution transformers in PT. PLN (Persero) ULP Karang,namely the K622 Distribution Transformer at the Rainbow Feeder with a load of 110.16% exceeding the standard set by SPLN, which is 80%. This study aims to find out how to overcome the Overload problem in the K622 distribution substation transformer on The Rainbow and get the size of the K622 distribution substation transformer load before and after the Uprating Transformer. From the results of uprating, the percentage of transformer loading value before uprating transformers was carried out by 110.16% and after uprating transformers by 26.38% so that it decreased by 83.78%. This means that the uprating transformer is one of the methods that can be used to overcome excess loads.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信