估计还是拖延?

C.J. Liddle
{"title":"估计还是拖延?","authors":"C.J. Liddle","doi":"10.1016/0377-841X(78)90062-1","DOIUrl":null,"url":null,"abstract":"<div><p>This paper centres on the theme of the art and science of capital cost estimation; whether and to what extent it is procrastinative or sophistic; its theoretical basis and whether this stands the test of practicality; whether, indeed it is possible or wise to be completely consistent.</p><p>In presenting a somewhat distorted view of some of these aspects of estimation, it is the author's hope that more serious questions may be raised in the minds of the audience.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 3","pages":"Pages 165-173"},"PeriodicalIF":0.0000,"publicationDate":"1978-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90062-1","citationCount":"1","resultStr":"{\"title\":\"Estimation or procrastination?\",\"authors\":\"C.J. Liddle\",\"doi\":\"10.1016/0377-841X(78)90062-1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper centres on the theme of the art and science of capital cost estimation; whether and to what extent it is procrastinative or sophistic; its theoretical basis and whether this stands the test of practicality; whether, indeed it is possible or wise to be completely consistent.</p><p>In presenting a somewhat distorted view of some of these aspects of estimation, it is the author's hope that more serious questions may be raised in the minds of the audience.</p></div>\",\"PeriodicalId\":100475,\"journal\":{\"name\":\"Engineering and Process Economics\",\"volume\":\"3 3\",\"pages\":\"Pages 165-173\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1978-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0377-841X(78)90062-1\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Process Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0377841X78900621\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X78900621","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文以资本成本估算的艺术与科学为主题;是否以及在多大程度上是拖延或诡辩;其理论基础及是否经得起实践检验;是否完全一致是可能的或明智的。作者对这些评估的某些方面提出了一种有些扭曲的观点,希望在读者的脑海中提出更严肃的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Estimation or procrastination?

This paper centres on the theme of the art and science of capital cost estimation; whether and to what extent it is procrastinative or sophistic; its theoretical basis and whether this stands the test of practicality; whether, indeed it is possible or wise to be completely consistent.

In presenting a somewhat distorted view of some of these aspects of estimation, it is the author's hope that more serious questions may be raised in the minds of the audience.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信