{"title":"建设高压试验设施","authors":"W. McDermid, J. Lambert","doi":"10.1109/TDC.2012.6281551","DOIUrl":null,"url":null,"abstract":"Manitoba Hydro has constructed a facility for dielectric testing of equipment rated up to 500 kVac and 500 kVdc. A test system for induced, no-load and full load tests on large power transformers is being added.","PeriodicalId":19873,"journal":{"name":"PES T&D 2012","volume":"321 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Construction of a high voltage test facility\",\"authors\":\"W. McDermid, J. Lambert\",\"doi\":\"10.1109/TDC.2012.6281551\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Manitoba Hydro has constructed a facility for dielectric testing of equipment rated up to 500 kVac and 500 kVdc. A test system for induced, no-load and full load tests on large power transformers is being added.\",\"PeriodicalId\":19873,\"journal\":{\"name\":\"PES T&D 2012\",\"volume\":\"321 1\",\"pages\":\"1-4\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PES T&D 2012\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2012.6281551\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PES T&D 2012","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2012.6281551","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Manitoba Hydro has constructed a facility for dielectric testing of equipment rated up to 500 kVac and 500 kVdc. A test system for induced, no-load and full load tests on large power transformers is being added.