{"title":"爱尔兰国家森林采伐调度系统的评估-两个案例研究","authors":"M. Nieuwenhuis, C. Nugent","doi":"10.1080/08435243.2000.10702751","DOIUrl":null,"url":null,"abstract":"Abstract Coillte Teoranta (the Irish Forestry Board) harvested approximately 2.0 million m3 in 1994. By the year 2000 this annual harvest is projected to increase to approximately 2.8 million m3 and to 3.7 million m3 by the year 2011. To facilitate the management of these increased timber flows more efficiently and effectively, the Harvest Scheduling System (HSS) was developed. In order to evaluate the HSS’s solutions, five case studies were carried out, two of which are presented in this paper. Initially, the HSS model was solved without any management constraints, resulting in a theoretical maximum net present value (NPV) (case study 1). Subsequently, the effect of imposing national and regional level volume fluctuation constraints was examined (case study 2). The investigations in the “no constraints” study resulted in a theoretical optimal harvest schedule for Coillte over the period 1998 to 2002. The solution showed great volume fluctuations from year to year, in terms of total volume, species, harvest type and product. It would be impossible to implement such a schedule, due to management, harvesting resources and industry requirements. However, the NPV achieved was used as a base to estimate the cost of applying management constraints in the second case study. This second study also showed that Coillte’s production smoothing process results in harvest schedules that are not feasible, as no adjustments for volume are included.","PeriodicalId":36173,"journal":{"name":"European Journal of Forest Engineering","volume":"13 1","pages":"23 - 27"},"PeriodicalIF":0.0000,"publicationDate":"2000-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The Evaluation of a National Forest Harvest Scheduling System for Ireland – Two Case Studies\",\"authors\":\"M. Nieuwenhuis, C. Nugent\",\"doi\":\"10.1080/08435243.2000.10702751\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Coillte Teoranta (the Irish Forestry Board) harvested approximately 2.0 million m3 in 1994. By the year 2000 this annual harvest is projected to increase to approximately 2.8 million m3 and to 3.7 million m3 by the year 2011. To facilitate the management of these increased timber flows more efficiently and effectively, the Harvest Scheduling System (HSS) was developed. In order to evaluate the HSS’s solutions, five case studies were carried out, two of which are presented in this paper. Initially, the HSS model was solved without any management constraints, resulting in a theoretical maximum net present value (NPV) (case study 1). Subsequently, the effect of imposing national and regional level volume fluctuation constraints was examined (case study 2). The investigations in the “no constraints” study resulted in a theoretical optimal harvest schedule for Coillte over the period 1998 to 2002. The solution showed great volume fluctuations from year to year, in terms of total volume, species, harvest type and product. It would be impossible to implement such a schedule, due to management, harvesting resources and industry requirements. However, the NPV achieved was used as a base to estimate the cost of applying management constraints in the second case study. This second study also showed that Coillte’s production smoothing process results in harvest schedules that are not feasible, as no adjustments for volume are included.\",\"PeriodicalId\":36173,\"journal\":{\"name\":\"European Journal of Forest Engineering\",\"volume\":\"13 1\",\"pages\":\"23 - 27\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Forest Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/08435243.2000.10702751\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Forest Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/08435243.2000.10702751","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 3

摘要

Coillte Teoranta(爱尔兰林业委员会)在1994年收获了大约200万立方米。到2000年,这一年产量预计将增加到约280万立方米,到2011年将增加到370万立方米。为了更有效地管理这些增加的木材流量,开发了采伐调度系统(HSS)。为了评估HSS的解决方案,进行了五个案例研究,本文给出了其中的两个。最初,在没有任何管理约束的情况下求解了HSS模型,得到了理论上的最大净现值(NPV)(案例研究1)。随后,研究了施加国家和区域层面的体积波动约束的影响(案例研究2)。在“无约束”研究中的调查得出了1998年至2002年Coillte的理论最佳收获计划。溶液在总量、种类、收获类型和产品等方面呈现出较大的年际波动。由于管理、收获资源和行业需求,这样的时间表是不可能实现的。然而,在第二个案例研究中,实现的净现值被用作估计应用管理约束的成本的基础。第二项研究还表明,Coillte的生产平滑过程导致的收获计划不可行,因为没有对产量进行调整。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Evaluation of a National Forest Harvest Scheduling System for Ireland – Two Case Studies
Abstract Coillte Teoranta (the Irish Forestry Board) harvested approximately 2.0 million m3 in 1994. By the year 2000 this annual harvest is projected to increase to approximately 2.8 million m3 and to 3.7 million m3 by the year 2011. To facilitate the management of these increased timber flows more efficiently and effectively, the Harvest Scheduling System (HSS) was developed. In order to evaluate the HSS’s solutions, five case studies were carried out, two of which are presented in this paper. Initially, the HSS model was solved without any management constraints, resulting in a theoretical maximum net present value (NPV) (case study 1). Subsequently, the effect of imposing national and regional level volume fluctuation constraints was examined (case study 2). The investigations in the “no constraints” study resulted in a theoretical optimal harvest schedule for Coillte over the period 1998 to 2002. The solution showed great volume fluctuations from year to year, in terms of total volume, species, harvest type and product. It would be impossible to implement such a schedule, due to management, harvesting resources and industry requirements. However, the NPV achieved was used as a base to estimate the cost of applying management constraints in the second case study. This second study also showed that Coillte’s production smoothing process results in harvest schedules that are not feasible, as no adjustments for volume are included.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
European Journal of Forest Engineering
European Journal of Forest Engineering Agricultural and Biological Sciences-Forestry
CiteScore
1.30
自引率
0.00%
发文量
6
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信