{"title":"影响改造工程延期的风险因素——以办公楼工程为例","authors":"Kyuman Cho, Kim, Taehoon","doi":"10.5345/JKIBC.2018.18.4.385","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":17348,"journal":{"name":"Journal of the Korean Institute of Building Construction","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects -\",\"authors\":\"Kyuman Cho, Kim, Taehoon\",\"doi\":\"10.5345/JKIBC.2018.18.4.385\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":17348,\"journal\":{\"name\":\"Journal of the Korean Institute of Building Construction\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Korean Institute of Building Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5345/JKIBC.2018.18.4.385\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Korean Institute of Building Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5345/JKIBC.2018.18.4.385","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}