{"title":"基于未确知集的国际工程承包风险评估","authors":"Shujing Zhou, Li Liu, Chao Wu, Yancang Li","doi":"10.1109/IWISA.2009.5073098","DOIUrl":null,"url":null,"abstract":"To management the risk of International Project Contracting where the chance and risk are accreted and the risk is bigger than the domestic engineering, the paper sets up the comprehensive evaluation system and a model of risk assessment by using the unascertained set for evaluating the risk of the international project contracting. Finally, the practicality and feasibility of the model are illustrated by the engineering practice.","PeriodicalId":6327,"journal":{"name":"2009 International Workshop on Intelligent Systems and Applications","volume":"42 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2009-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Assessment of International Project Contracting Based on Unascertained Set\",\"authors\":\"Shujing Zhou, Li Liu, Chao Wu, Yancang Li\",\"doi\":\"10.1109/IWISA.2009.5073098\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To management the risk of International Project Contracting where the chance and risk are accreted and the risk is bigger than the domestic engineering, the paper sets up the comprehensive evaluation system and a model of risk assessment by using the unascertained set for evaluating the risk of the international project contracting. Finally, the practicality and feasibility of the model are illustrated by the engineering practice.\",\"PeriodicalId\":6327,\"journal\":{\"name\":\"2009 International Workshop on Intelligent Systems and Applications\",\"volume\":\"42 1\",\"pages\":\"1-4\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-05-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 International Workshop on Intelligent Systems and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IWISA.2009.5073098\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Workshop on Intelligent Systems and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IWISA.2009.5073098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk Assessment of International Project Contracting Based on Unascertained Set
To management the risk of International Project Contracting where the chance and risk are accreted and the risk is bigger than the domestic engineering, the paper sets up the comprehensive evaluation system and a model of risk assessment by using the unascertained set for evaluating the risk of the international project contracting. Finally, the practicality and feasibility of the model are illustrated by the engineering practice.