Ernamaiyanti, Mega Yunanda
{"title":"FEASIBILITY STUDY (STUDI KELAYAKAN) PERENCANAAN PEMBANGUNAN TPS 3R DI PULAU SABIRA KABUPATEN KEPULAUAN SERIBU PROVINSI DKI JAKARTA)","authors":"Ernamaiyanti, Mega Yunanda","doi":"10.36050/berings.v9i01.455","DOIUrl":null,"url":null,"abstract":"The purpose of this study was to compile a technical study of planning for the construction of 3R TPS on Sabira Island, Seribu Islands Regency, DKI Jakarta Province. The research method is a quantitative method. The types of surveys carried out are polygon and rate generation. The plan for the construction of the Sabira Island 3R TPS is recommended in an available location with a land area of ±375 m2 or 15 m x 25 m. The condition of Service and Waste Management on Sabira Island has a weighting score with a total score of 14. This means that the criteria for service and waste processing locations for the construction of 3R TPS on Sabira Island are recommended in the available locations. Of the four waste processing technologies on Sabira Island that were assessed using the SWOT method, it was concluded that composting was the one that exceeded the median score for both internal and external environmental factors. The number of collecting vehicles for motorbike carts on Sabira Island is 4 trips/day (1 (one) unit of existing motorbike cart is suitable for use). The loading rate to be processed at the 3R TPS on Sabira Island is 0.542 m3/hour. The land area required for the construction of the 3R TPS on Sabira Island is 193.67 m2. The social feasibility study in the plan for the construction of the 3R TPS on Sabira Island is that the people of Sabira Island support the plan for the construction of the 3R TPS. The service period of 3R TPS according to the technical analysis above is 10 years. Facilities and infrastructure are evaluated according to the applicable SNI standards in the current planning year.","PeriodicalId":17796,"journal":{"name":"JURNAL ILMIAH BERING'S","volume":"19 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL ILMIAH BERING'S","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36050/berings.v9i01.455","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是编制3R TPS规划的技术研究,沙比拉岛,西里武群岛,DKI雅加达省。研究方法为定量方法。所进行的调查类型是多边形和速率生成。萨比拉岛3R TPS的建设计划建议在土地面积为±375平方米或15米× 25米的可用位置。萨比拉岛的服务和废物管理状况的加权得分为14分。这意味着,在沙比拉岛兴建3R污水处理厂的服务和废物处理地点的标准,是在可用的地点建议的。采用SWOT方法对萨比拉岛的四种废弃物处理技术进行了评估,结果表明堆肥是一种内外环境因素得分均超过中位数的废弃物处理技术。沙比拉岛电单车收集车辆的数目为每天4次(现有电单车可使用1(1)辆)。萨比拉岛3R TPS处理的装载速率为0.542立方米/小时。在萨比拉岛建设3R TPS所需的土地面积为193.67平方米。在萨比拉岛建设3R TPS计划中的社会可行性研究是萨比拉岛人民支持建设3R TPS计划。根据上述技术分析,3R TPS的服务年限为10年。在本规划年度,根据适用的SNI标准对设施和基础设施进行评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
FEASIBILITY STUDY (STUDI KELAYAKAN) PERENCANAAN PEMBANGUNAN TPS 3R DI PULAU SABIRA KABUPATEN KEPULAUAN SERIBU PROVINSI DKI JAKARTA)
The purpose of this study was to compile a technical study of planning for the construction of 3R TPS on Sabira Island, Seribu Islands Regency, DKI Jakarta Province. The research method is a quantitative method. The types of surveys carried out are polygon and rate generation. The plan for the construction of the Sabira Island 3R TPS is recommended in an available location with a land area of ±375 m2 or 15 m x 25 m. The condition of Service and Waste Management on Sabira Island has a weighting score with a total score of 14. This means that the criteria for service and waste processing locations for the construction of 3R TPS on Sabira Island are recommended in the available locations. Of the four waste processing technologies on Sabira Island that were assessed using the SWOT method, it was concluded that composting was the one that exceeded the median score for both internal and external environmental factors. The number of collecting vehicles for motorbike carts on Sabira Island is 4 trips/day (1 (one) unit of existing motorbike cart is suitable for use). The loading rate to be processed at the 3R TPS on Sabira Island is 0.542 m3/hour. The land area required for the construction of the 3R TPS on Sabira Island is 193.67 m2. The social feasibility study in the plan for the construction of the 3R TPS on Sabira Island is that the people of Sabira Island support the plan for the construction of the 3R TPS. The service period of 3R TPS according to the technical analysis above is 10 years. Facilities and infrastructure are evaluated according to the applicable SNI standards in the current planning year.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信