{"title":"土钉稳定边坡的实践与施工现实——以不丹Phuentsholing-Thimphu高速公路土钉墙施工为例","authors":"Gautam Thapa, Raju Sarkar, Dhruv Bhardwaj, Lhendup Dorji","doi":"10.1007/978-981-16-7314-6_20","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":61997,"journal":{"name":"城镇化与集约用地","volume":"87 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Slope Stabilization Using Soil Nails, Practice and Construction Realities: A Case Study on the Construction of Soil Nailed Wall Along Phuentsholing-Thimphu Highway, Bhutan\",\"authors\":\"Gautam Thapa, Raju Sarkar, Dhruv Bhardwaj, Lhendup Dorji\",\"doi\":\"10.1007/978-981-16-7314-6_20\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":61997,\"journal\":{\"name\":\"城镇化与集约用地\",\"volume\":\"87 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"城镇化与集约用地\",\"FirstCategoryId\":\"1089\",\"ListUrlMain\":\"https://doi.org/10.1007/978-981-16-7314-6_20\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"城镇化与集约用地","FirstCategoryId":"1089","ListUrlMain":"https://doi.org/10.1007/978-981-16-7314-6_20","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Slope Stabilization Using Soil Nails, Practice and Construction Realities: A Case Study on the Construction of Soil Nailed Wall Along Phuentsholing-Thimphu Highway, Bhutan