{"title":"用经济订单计算方法分析木材生产过程中的补充用品(EOQ)","authors":"I. Saifudin, Moch. Nuruddin","doi":"10.33884/jrsi.v8i1.6386","DOIUrl":null,"url":null,"abstract":"Inventory control is one of the most important things for the company, because without proper and optimal inventory control the company will experience a problem in meeting production needs and consumer demand needs both in the form of goods and services produced by the company. a wood manufacturing company located in Gresik Regency. In the process of making products, problems often occur, namely the number of requests for complementary tools that are quite large and uncontrolled, it is necessary to have optimal inventory control. To minimize the inventory, Economic Order Quantity (EOQ) analysis can be used as a control or ordering tool for the company so that the ordering becomes optimal. From the results of calculations that have been carried out, the calculation shows that the relationship between the EOQ, Safety Stock, ROP, and Inventory methods of complementary tools for grinding grinding stones 8 INCH and grinding stones 4 x 1.2 mm is as follows: in the period September 2021 - July 20222 it shows that the purchase of complementary tools when the stock of 8 INCH grinding stones is 17 units and 4 x 1.2 mm grinding stones are 10 units, thus when ordering complementary tools are received with a Lead Time of 7 days for 8 INCH grinding stones and 4 days for 4 x 1.2 mm grinding stones, safety stock still remaining 7 units for the 8 INCH Grinding Stone and 5 units for the 4x1.2 mm Grinding Stone, while to avoid excess number of complementary tools in the warehouse, the optimal number of purchases of 8 INCH Grinding Stones and 4x1.2 mm Grinding Stones of 117 and 159 units. With calculations using the EOQ method, the total value of the supply of complementary tools for grinding grinding stones 8 INCH and grinding stones 4x1.2 mm is Rp. 469,041 da Rp. 253.968.","PeriodicalId":32888,"journal":{"name":"Jurnal Rekayasa Sistem Industri","volume":"23 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS PERSEDIAAN ALAT PELENGKAP PADA PROSES PRODUKSI KAYU DENGAN METODE ECONOMIC ORDER QUANTITY (EOQ)\",\"authors\":\"I. Saifudin, Moch. Nuruddin\",\"doi\":\"10.33884/jrsi.v8i1.6386\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Inventory control is one of the most important things for the company, because without proper and optimal inventory control the company will experience a problem in meeting production needs and consumer demand needs both in the form of goods and services produced by the company. a wood manufacturing company located in Gresik Regency. In the process of making products, problems often occur, namely the number of requests for complementary tools that are quite large and uncontrolled, it is necessary to have optimal inventory control. To minimize the inventory, Economic Order Quantity (EOQ) analysis can be used as a control or ordering tool for the company so that the ordering becomes optimal. From the results of calculations that have been carried out, the calculation shows that the relationship between the EOQ, Safety Stock, ROP, and Inventory methods of complementary tools for grinding grinding stones 8 INCH and grinding stones 4 x 1.2 mm is as follows: in the period September 2021 - July 20222 it shows that the purchase of complementary tools when the stock of 8 INCH grinding stones is 17 units and 4 x 1.2 mm grinding stones are 10 units, thus when ordering complementary tools are received with a Lead Time of 7 days for 8 INCH grinding stones and 4 days for 4 x 1.2 mm grinding stones, safety stock still remaining 7 units for the 8 INCH Grinding Stone and 5 units for the 4x1.2 mm Grinding Stone, while to avoid excess number of complementary tools in the warehouse, the optimal number of purchases of 8 INCH Grinding Stones and 4x1.2 mm Grinding Stones of 117 and 159 units. With calculations using the EOQ method, the total value of the supply of complementary tools for grinding grinding stones 8 INCH and grinding stones 4x1.2 mm is Rp. 469,041 da Rp. 253.968.\",\"PeriodicalId\":32888,\"journal\":{\"name\":\"Jurnal Rekayasa Sistem Industri\",\"volume\":\"23 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Rekayasa Sistem Industri\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33884/jrsi.v8i1.6386\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Rekayasa Sistem Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33884/jrsi.v8i1.6386","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

库存控制是公司最重要的事情之一,因为没有适当和最优的库存控制,公司将在满足生产需求和消费者需求方面遇到问题,无论是公司生产的商品还是服务。位于Gresik Regency的一家木材制造公司。在产品的制造过程中,经常会出现一些问题,即对配套工具的需求数量相当大且不受控制,因此需要进行最优的库存控制。为了最大限度地减少库存,经济订货量(EOQ)分析可以作为公司的控制或订购工具,使订购成为最优。从已经进行的计算结果来看,8寸磨石和4 × 1.2 mm磨石配套工具的EOQ、Safety Stock、ROP、Inventory方法之间的关系如下:在2021年9月- 20222年7月期间显示购买的补充工具当股票8英寸磨石头是17单元和4 x 1.2毫米磨石头有10个单位,因此在订购时补充工具收到了7天的交货时间为8英寸磨石头和4天4 x 1.2毫米磨石头,安全库存还剩下7单位8英寸磨石和5单元4 x1.2 mm研磨石,同时为避免仓库中配套工具数量过多,8寸磨石和4x1.2 mm磨石的最佳采购数量分别为117和159台。通过EOQ法计算,8寸磨石和4x1.2 mm磨石配套工具的供应总价值为Rp. 469,041和Rp. 253.968。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS PERSEDIAAN ALAT PELENGKAP PADA PROSES PRODUKSI KAYU DENGAN METODE ECONOMIC ORDER QUANTITY (EOQ)
Inventory control is one of the most important things for the company, because without proper and optimal inventory control the company will experience a problem in meeting production needs and consumer demand needs both in the form of goods and services produced by the company. a wood manufacturing company located in Gresik Regency. In the process of making products, problems often occur, namely the number of requests for complementary tools that are quite large and uncontrolled, it is necessary to have optimal inventory control. To minimize the inventory, Economic Order Quantity (EOQ) analysis can be used as a control or ordering tool for the company so that the ordering becomes optimal. From the results of calculations that have been carried out, the calculation shows that the relationship between the EOQ, Safety Stock, ROP, and Inventory methods of complementary tools for grinding grinding stones 8 INCH and grinding stones 4 x 1.2 mm is as follows: in the period September 2021 - July 20222 it shows that the purchase of complementary tools when the stock of 8 INCH grinding stones is 17 units and 4 x 1.2 mm grinding stones are 10 units, thus when ordering complementary tools are received with a Lead Time of 7 days for 8 INCH grinding stones and 4 days for 4 x 1.2 mm grinding stones, safety stock still remaining 7 units for the 8 INCH Grinding Stone and 5 units for the 4x1.2 mm Grinding Stone, while to avoid excess number of complementary tools in the warehouse, the optimal number of purchases of 8 INCH Grinding Stones and 4x1.2 mm Grinding Stones of 117 and 159 units. With calculations using the EOQ method, the total value of the supply of complementary tools for grinding grinding stones 8 INCH and grinding stones 4x1.2 mm is Rp. 469,041 da Rp. 253.968.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
11
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信