推动、停止和重新规划:图形上的卵石运动在自动化仓库规划中的应用

Miroslav Kulich, T. Novák, L. Preucil
{"title":"推动、停止和重新规划:图形上的卵石运动在自动化仓库规划中的应用","authors":"Miroslav Kulich, T. Novák, L. Preucil","doi":"10.1109/ITSC.2019.8916906","DOIUrl":null,"url":null,"abstract":"The pebble-motion on graphs is a subcategory of multi-agent pathfinding problems dealing with moving multiple pebble-like objects from a node to a node in a graph with a constraint that only one pebble can occupy one node at a given time. Additionally, algorithms solving this problem assume that individual pebbles (robots) cannot move at the same time and their movement is discrete. These assumptions disqualify them from being directly used in practical applications, although they have otherwise nice theoretical properties. We present modifications of the Push and Rotate algorithm [1], which relax the presumptions mentioned above and demonstrate, through a set of experiments, that the modified algorithm is applicable for planning in automated warehouses.","PeriodicalId":6717,"journal":{"name":"2019 IEEE Intelligent Transportation Systems Conference (ITSC)","volume":"9 1","pages":"4456-4463"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Push, Stop, and Replan: An Application of Pebble Motion on Graphs to Planning in Automated Warehouses\",\"authors\":\"Miroslav Kulich, T. Novák, L. Preucil\",\"doi\":\"10.1109/ITSC.2019.8916906\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The pebble-motion on graphs is a subcategory of multi-agent pathfinding problems dealing with moving multiple pebble-like objects from a node to a node in a graph with a constraint that only one pebble can occupy one node at a given time. Additionally, algorithms solving this problem assume that individual pebbles (robots) cannot move at the same time and their movement is discrete. These assumptions disqualify them from being directly used in practical applications, although they have otherwise nice theoretical properties. We present modifications of the Push and Rotate algorithm [1], which relax the presumptions mentioned above and demonstrate, through a set of experiments, that the modified algorithm is applicable for planning in automated warehouses.\",\"PeriodicalId\":6717,\"journal\":{\"name\":\"2019 IEEE Intelligent Transportation Systems Conference (ITSC)\",\"volume\":\"9 1\",\"pages\":\"4456-4463\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE Intelligent Transportation Systems Conference (ITSC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ITSC.2019.8916906\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE Intelligent Transportation Systems Conference (ITSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITSC.2019.8916906","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

图上的鹅卵石运动是多代理寻路问题的一个子类别,该问题处理将多个类似鹅卵石的对象从图中的一个节点移动到另一个节点,并约束在给定时间内只有一个鹅卵石可以占用一个节点。此外,解决这个问题的算法假设单个鹅卵石(机器人)不能同时移动,并且它们的运动是离散的。这些假设使它们无法直接用于实际应用,尽管它们在其他方面具有很好的理论性质。我们提出了对Push and Rotate算法的改进[1],放宽了上述的假设,并通过一组实验证明了改进后的算法适用于自动化仓库的规划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Push, Stop, and Replan: An Application of Pebble Motion on Graphs to Planning in Automated Warehouses
The pebble-motion on graphs is a subcategory of multi-agent pathfinding problems dealing with moving multiple pebble-like objects from a node to a node in a graph with a constraint that only one pebble can occupy one node at a given time. Additionally, algorithms solving this problem assume that individual pebbles (robots) cannot move at the same time and their movement is discrete. These assumptions disqualify them from being directly used in practical applications, although they have otherwise nice theoretical properties. We present modifications of the Push and Rotate algorithm [1], which relax the presumptions mentioned above and demonstrate, through a set of experiments, that the modified algorithm is applicable for planning in automated warehouses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信