{"title":"在非流动井中进行单次起下钻油管输送射孔、生产测试和压力累积测试","authors":"J. Barnes, P. Snider, C. V. Swafford","doi":"10.2118/18841-PA","DOIUrl":null,"url":null,"abstract":"This paper describes tools and procedures for tubing-conveyed perforating (TCP) and subsequent production testing of a well with a reverse-flow jet pump with a specially designed blanking sleeve. A downhole shut-in pressure buildup is also obtained and all equipment is pressure-actuated, eliminating the use of wireline.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"95 1","pages":"199-203"},"PeriodicalIF":0.0000,"publicationDate":"1991-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Single-trip tubing-conveyed perforating, production testing, and pressure-buildup testing in nonflowing wells\",\"authors\":\"J. Barnes, P. Snider, C. V. Swafford\",\"doi\":\"10.2118/18841-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes tools and procedures for tubing-conveyed perforating (TCP) and subsequent production testing of a well with a reverse-flow jet pump with a specially designed blanking sleeve. A downhole shut-in pressure buildup is also obtained and all equipment is pressure-actuated, eliminating the use of wireline.\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"95 1\",\"pages\":\"199-203\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/18841-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/18841-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Single-trip tubing-conveyed perforating, production testing, and pressure-buildup testing in nonflowing wells
This paper describes tools and procedures for tubing-conveyed perforating (TCP) and subsequent production testing of a well with a reverse-flow jet pump with a specially designed blanking sleeve. A downhole shut-in pressure buildup is also obtained and all equipment is pressure-actuated, eliminating the use of wireline.