{"title":"渐进式设计-建造交付方法:项目绩效评估","authors":"Ruqaya Alameri, B. Esmaeili","doi":"10.1080/15578771.2021.1950242","DOIUrl":null,"url":null,"abstract":"ABSTRACT As the progressive design-build (PDB) delivery method is gained traction in the construction industry, owners are interested to understand the factors that govern performance in such projects. This study examined the impact of variables such as time of involvement, team selection, and team behavior on project performance for projects delivered using the PDB method. To achieve our goal, the research team first compiled a database of 19 completed PDB projects and analyzed the data using Mann–Whitney U test. The significant results of the statistical analysis provided a list of best practices owners can follow to increase their chances of achieving success in PDB projects. Within academia, this study contributes an early performance database for assessing PDB projects. Within industry, practitioners will benefit from the results, which identify best practices for maximizing success in PDB projects and provide guidelines for using PDB as a delivery method, based on owner and project characteristics.","PeriodicalId":39782,"journal":{"name":"International Journal of Construction Education and Research","volume":"116 1","pages":"22 - 41"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Progressive Design-build Delivery Method: Assessment of Project Performance\",\"authors\":\"Ruqaya Alameri, B. Esmaeili\",\"doi\":\"10.1080/15578771.2021.1950242\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT As the progressive design-build (PDB) delivery method is gained traction in the construction industry, owners are interested to understand the factors that govern performance in such projects. This study examined the impact of variables such as time of involvement, team selection, and team behavior on project performance for projects delivered using the PDB method. To achieve our goal, the research team first compiled a database of 19 completed PDB projects and analyzed the data using Mann–Whitney U test. The significant results of the statistical analysis provided a list of best practices owners can follow to increase their chances of achieving success in PDB projects. Within academia, this study contributes an early performance database for assessing PDB projects. Within industry, practitioners will benefit from the results, which identify best practices for maximizing success in PDB projects and provide guidelines for using PDB as a delivery method, based on owner and project characteristics.\",\"PeriodicalId\":39782,\"journal\":{\"name\":\"International Journal of Construction Education and Research\",\"volume\":\"116 1\",\"pages\":\"22 - 41\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Construction Education and Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/15578771.2021.1950242\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Construction Education and Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/15578771.2021.1950242","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Social Sciences","Score":null,"Total":0}
Progressive Design-build Delivery Method: Assessment of Project Performance
ABSTRACT As the progressive design-build (PDB) delivery method is gained traction in the construction industry, owners are interested to understand the factors that govern performance in such projects. This study examined the impact of variables such as time of involvement, team selection, and team behavior on project performance for projects delivered using the PDB method. To achieve our goal, the research team first compiled a database of 19 completed PDB projects and analyzed the data using Mann–Whitney U test. The significant results of the statistical analysis provided a list of best practices owners can follow to increase their chances of achieving success in PDB projects. Within academia, this study contributes an early performance database for assessing PDB projects. Within industry, practitioners will benefit from the results, which identify best practices for maximizing success in PDB projects and provide guidelines for using PDB as a delivery method, based on owner and project characteristics.
期刊介绍:
The International Journal of Construction Education and Research is a respected international refereed journal that publishes original works that address cutting edge issues related to construction around the globe. The Journal supports the mission of the Associated Schools of Construction (ASC), a professional association comprised of about 100 universities and colleges. The ASC encourages the sharing of ideas and knowledge and promotes excellence in curricula, teaching, research and service relating to the construction industry.