数字专家系统在油井维修保温工程规划设计中的应用实现

IF 1.7 0 ENGINEERING, PETROLEUM
R. V. Kaslivtsev, M. A. Kochekov, B. R. Vakhitov
{"title":"数字专家系统在油井维修保温工程规划设计中的应用实现","authors":"R. V. Kaslivtsev, M. A. Kochekov, B. R. Vakhitov","doi":"10.5510/ogp2022si200758","DOIUrl":null,"url":null,"abstract":"During the operation of producing oil and gas wells, oil from formations is extracted together with water. In the case of a significant water cut in a well it is economically feasible and technologically necessary to carry out geological and technical actions (GTA) with the aim to reduce the water cut - repair and isolation works (RIW). Designing actions for RIW is associated with a analysis of the reasons of increase of water cut and the development of methods for eliminating the identified problem. The use of expert systems makes it possible to implement an integrated approach to the design of actions for RIW with a choice of necessary compositions, and designs of works, taking into different processes. Keywords: expert system; repair and insulation works; optimization; design.","PeriodicalId":43516,"journal":{"name":"SOCAR Proceedings","volume":null,"pages":null},"PeriodicalIF":1.7000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Applied implementation of digital expert systems in the process of planning and designing repair and insulation works in oil wells\",\"authors\":\"R. V. Kaslivtsev, M. A. Kochekov, B. R. Vakhitov\",\"doi\":\"10.5510/ogp2022si200758\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"During the operation of producing oil and gas wells, oil from formations is extracted together with water. In the case of a significant water cut in a well it is economically feasible and technologically necessary to carry out geological and technical actions (GTA) with the aim to reduce the water cut - repair and isolation works (RIW). Designing actions for RIW is associated with a analysis of the reasons of increase of water cut and the development of methods for eliminating the identified problem. The use of expert systems makes it possible to implement an integrated approach to the design of actions for RIW with a choice of necessary compositions, and designs of works, taking into different processes. Keywords: expert system; repair and insulation works; optimization; design.\",\"PeriodicalId\":43516,\"journal\":{\"name\":\"SOCAR Proceedings\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.7000,\"publicationDate\":\"2022-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SOCAR Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5510/ogp2022si200758\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"0\",\"JCRName\":\"ENGINEERING, PETROLEUM\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SOCAR Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5510/ogp2022si200758","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 0

摘要

在生产油气井的作业过程中,地层中的油和水一起被开采出来。在井中出现严重含水率的情况下,开展地质和技术行动(GTA)以减少含水率是经济上可行和技术上必要的,即修复和隔离工程(RIW)。设计RIW的措施与分析含水率增加的原因和开发消除已确定问题的方法有关。专家系统的使用可以实现一种综合的方法来设计RIW的动作,选择必要的组合,并设计作品,考虑到不同的过程。关键词:专家系统;维修及绝缘工程;优化;设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Applied implementation of digital expert systems in the process of planning and designing repair and insulation works in oil wells
During the operation of producing oil and gas wells, oil from formations is extracted together with water. In the case of a significant water cut in a well it is economically feasible and technologically necessary to carry out geological and technical actions (GTA) with the aim to reduce the water cut - repair and isolation works (RIW). Designing actions for RIW is associated with a analysis of the reasons of increase of water cut and the development of methods for eliminating the identified problem. The use of expert systems makes it possible to implement an integrated approach to the design of actions for RIW with a choice of necessary compositions, and designs of works, taking into different processes. Keywords: expert system; repair and insulation works; optimization; design.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
SOCAR Proceedings
SOCAR Proceedings ENGINEERING, PETROLEUM-
CiteScore
3.00
自引率
82.40%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信